Dam/Weir: PORINGALKUTHU DAM |
Location | Latitude : 10⁰ 18′ 45 ” N | Dam Features |
Longitude: 76⁰ 38′ 40” E | Type of Dam | Masonry – Gravity |
Panchayath | Athirappally | Classification | HH (High Height) |
Village | Athirappally | Maximum Water Level (MWL) | 423.98 m |
District | Thrissur | Full Reservoir Level ( FRL) | 423.98 m |
River Basin | Chalakudy | Storage at FRL | 32.00 Mm3 |
River | Chalakudy | Height from deepest foundation | 36.88 m |
Release from Dam to river | Chalakudy | Length | 365.76 m |
Taluk through which release flows | Chalakudy, Aluva, Kodungallur, Paravoor | Spillway | Ogee type, 7 Nos.dropping type, each of size 11.58 x 5.94 m |
Year of completion | 1957 | Crest Level | 419.41 m |
Name of Project | Poringalkuthu HEP | River Outlet | 4 Nos. sluice 2.44 x 5.77 m |
Purpose of Project | Hydro Power | Officers in charge & phone No. | Executive Engineer, Dam Safety Division No. III, Idamalayar PIN-686681 Phone – 9446008426 |
Installed capacity of the Project | 52 MW | Assistant Executive Engineer, Dam Safety Sub Division, Poringalkuthu PIN- 680721 Phone-9496018372 |
Project Identification Code ( PIC) | KL29HH0006 |
The Poringalkuthu reservoir is created by constructing a dam across Chalakudy river. The inflow of Poringalkuthu reservoir is contributed partly from the tail water of upstream Sholayar HEP. In addition, the reservoir receives water from catchments downstream of Parambikulam and Thunakadavu dams of PAP Project. The spill waters of above dams also flow to this reservoir. The water from Poringalkuthu reservoir is diverted through a water conductor system to two Powerhouses of Poringalkuthu Hydro Electric Project (PHEP) & Porigalkuthu left bank Extension scheme located on the left bank of Chalakudy river. After generating power, the water is released to Chalakudy river itself. |