Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2375.68ft | 1014.828 | 69.53% | 2397.46ft | 1365.178 | 5.96 | 40.18 | 0.00 | 40.18 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 158.29 | 712.830 | 70.04% | 164.66 | 892.508 | 8.59 | 23.42 | 0.00 | 23.42 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 974.68 | 339.480 | 76.03% | 978.43 | 393.880 | 9.44 | 20.44 | 0.00 | 20.44 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 769.85 | 133.050 | 66.19% | 770.30 | 138.350 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.00MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2660.00 ft | 140.622 | 94.32% | 2658.40 ft | 136.310 | 0.00 | 9.39 | 0.00 | 9.39 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1598.60 | 51.740 | 94.47% | 1596.20 | 45.440 | 2.06 | 2.06 | 0.00 | 2.06 | 0.00 | Sluice Discharge-0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.07 | 50.0953 | 100.53% | 1207.04 | 49.9407 | 0.59 | 0.00 | 0.59 | 0.59 | 0.00 | ||
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 703.90 | 37.9322 | 80.03% | 706.00 | 42.7406 | 10.16 | 20.17 | 0.00 | 20.17 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.30 | 18.390 | 54.12% | 754.68 | 25.60 | 0.85 | 3.67 | 0.00 | 3.67 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 974.75 | 11.76 | 37.75% | 980.55 | 20.46 | 2.57 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 419.00 | 420.00 | 421.00 | 415.60 | 10.440 | 34.46% | 418.90 | 17.040 | 11.64 | 9.73 | 0.00 | 9.73 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.00 | 6.900 | 90.20% | 1757.85 | 6.795 | 5.10 | 0.00 | 5.10 | 5.10 | 0.00 | |||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.75 | 4.090 | 63.61% | 453.70 | 4.630 | 20.04 | 22.11 | 0.00 | 22.11 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 746.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.10 | 3.330 | 73.19% | 249.70 | 3.170 | 28.68 | 25.95 | 0.00 | 25.95 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 187.00 | 0.466 | 40.17% | 186.90 | 0.556 | 10.35 | 13.78 | 0.00 | 13.78 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 820.60 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 843.75 | 0.000 | 0.00% | 846.50 | 0.120 | 0.00 | 0.69 | 0.00 | 0.69 | 0.00 | Shut down Sluice+Syphon discharge-0.0598MCM (0.69Cumecs) | ||||
Grand Total | 3547.55 | 2537.08 | 71.52% | 3142.72 |