05.06.2023

Sl. No.Name of Dam / ReservoirDistrictMWL (metre)FRL (metre)Spillway Crest Level (metre)Live Storage at FRL (MCM)Rule level
(metre)
Blue level
(metre)
Orange level
(metre)
Red Level
(metre)
Today’s Water level (metre)Today’s Live Storage
(MCM)
% Storage wrt Live Storage at FRLSame day previous year Water level (metre)Same day previous year Live Storage  (MCM) Inflow (cumecs)Power House Discharge(cumecs)Spillway release (cumecs)Total Outflow (cumecs)Rain
fall (mm)
Remarks
1234567891011121314151617181920=18+192122
1IDUKKIIDK2408.5 ft2403 ft2373 ft1459.492373.00 ft2365.002371.002372.002311.36ft254.16917.41%2340.54ft553.12319.3576.960.0076.960.00 
2IDAMALAYAREKM171.00169.00161.001017.80161.00159.50160.00160.50134.48212.20020.85%138.90288.15011.1655.910.0055.911.00 
3KAKKI (ANATHODE )PTTA982.160981.460975.360446.51975.36973.36974.36974.86941.0768.73015.39%953.40131.9006.5133.820.0033.820.00 
4BANASURASAGAR
(K A SCHEME)
WND775.600775.600767.000201.00767.00765.50766.00766.50755.3017.3508.63%757.1026.9503.598.220.008.220.00Tunnel Outflow – 0.71 MCM
5SHOLAYARTSR2663 ft2663 ft2642 ft149.09 2658.002659.502661.002637.50ft88.05059.06%2560.901.4102.6914.380.0014.380.00 
6MADUPETTYIDK1599.591599.591594.7154.77 1596.001597.001598.001583.9020.14036.77%1585.5522.6151.034.180.004.181.00Sluice discharge/day – 0.00 McM
7ANAYIRANKALIDK1210.0701207.0201207.02049.83 1205.021206.021207.021191.003.10986.24%1191.934.71050.590.000.000.000.00Sluice discharge/day – 0 McM
8PONMUDIIDK708.660707.750701.35047.40 704.50705.50706.50686.109.097619.19%696.6524.75935.327.620.007.620.00 
9KUTTIYADI (KAKKAYAM)KKD758.040758.040751.64033.98 755.50756.50757.50746.709.96029.31%744.636.9712.666.080.006.086.00 
10PAMBAPTTA986.330986.330981.46031.15 982.00983.50984.50963.550.280.90%964.250.8162.890.000.000.000.00 
11PORINGALKUTHUTSR423.980423.980419.41030.30 419.00420.00421.00414.158.1827.00%415.8010.77015.9514.210.0014.210.00 
12KUNDALAIDK1759.301758.690 7.65 1755.001756.001757.001757.956.86589.74%1744.500.8403.820.003.823.8219.00 
13KALLARKUTTYIDK456.900456.590450.2006.43   455.00451.303.35052.10%451.203.3009.537.220.007.220.00 
14ERATTAYARIDK754.380754.380748.2805.29   748.28746.300.750014.17%746.60    0.00  
15LOWER PERIYAR IDK256.00253.00237.744.55   252.00247.802.45053.85%249.902.9008.7810.860.0010.860.00 
16MOOZHIYARPTTA192.940192.630186.5301.16   190.00188.300.60151.81%186.600.42526.2728.000.0028.008.00 
17KALLARIDK824.480824.480818.3800.76   823.50819.100.132817.40%818.40    0.00  
18SENGULAM (PUMPING STORAGE DAM)IDK849.49847.640847.640.39    842.900.0000.00%846.600.1400.000.000.000.000.00Tunnel filling started
Water level as on 05.06.2023 at 7.00AM