Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2373.00 ft | 2365.00 | 2371.00 | 2372.00 | 2305.64ft | 202.071 | 13.85% | 2338.12ft | 526.416 | 21.98 | 31.04 | 0.00 | 31.04 | 7.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.00 | 159.50 | 160.00 | 160.50 | 132.66 | 185.570 | 18.23% | 139.08 | 291.520 | 3.69 | 11.68 | 0.00 | 11.68 | 8.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 934.64 | 45.350 | 10.16% | 950.18 | 112.030 | 9.82 | 13.53 | 0.00 | 13.53 | 39.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 768.00 | 766.50 | 767.00 | 767.50 | 755.00 | 15.850 | 7.89% | 755.40 | 17.750 | 7.06 | 7.06 | 0.00 | 7.06 | 0.00 | Tunnel Outflow – 0.61 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2629.40ft | 72.922 | 48.91% | 2572.90 | 7.195 | 6.52 | 23.03 | 0.00 | 23.03 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1582.00 | 17.300 | 31.59% | 1583.95 | 20.220 | 5.06 | 2.34 | 0.00 | 2.34 | 0.40 | Sluice discharge/day – 0 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1192.75 | 6.1326 | 12.31% | 1193.83 | 8.0057 | 2.01 | 0.00 | 0.00 | 0.00 | 4.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 685.10 | 8.1058 | 17.10% | 694.40 | 21.0111 | 0.53 | 5.21 | 0.00 | 5.21 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 745.24 | 7.750 | 22.81% | 750.66 | 17.11 | 11.74 | 3.15 | 0.00 | 3.15 | 3.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.90 | 0.53 | 1.70% | 964.80 | 1.25 | 9.27 | 0.00 | 0.00 | 0.00 | 30.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 419.00 | 420.00 | 421.00 | 414.25 | 8.33 | 27.49% | 417.60 | 14.300 | 24.16 | 1.64 | 0.00 | 1.64 | 0.80 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1756.80 | 6.060 | 79.22% | 1747.45 | 1.702 | 5.19 | 0.00 | 1.50 | 1.50 | 3.40 | Sluice discharge/day – 0.283 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.50 | 3.450 | 53.65% | 453.10 | 4.270 | 11.17 | 11.17 | 0.00 | 11.17 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.30 | 0.7500 | 14.17% | 746.60 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.20 | 2.590 | 56.92% | 248.90 | 2.860 | 17.78 | 15.08 | 0.00 | 15.08 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.45 | 0.318 | 27.41% | 188.60 | 0.634 | 17.36 | 13.42 | 0.00 | 13.42 | 24.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.20 | 0.1387 | 18.18% | 818.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.50 | 0.120 | 30.77% | 847.00 | 0.240 | 4.74 | 5.28 | 0.00 | 5.28 | 0.00 |