Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2373.00 ft | 2365.00 | 2371.00 | 2372.00 | 2306.28ft | 207.907 | 14.25% | 2340.06ft | 547.224 | 35.16 | 23.12 | 0.00 | 23.12 | 8.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.00 | 159.50 | 160.00 | 160.50 | 133.16 | 192.820 | 18.94% | 141.09 | 330.292 | 15.31 | 0.00 | 0.00 | 0.00 | 1.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 936.04 | 50.040 | 11.21% | 951.33 | 118.780 | 11.65 | 1.35 | 0.00 | 1.35 | 1.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 768.00 | 766.50 | 767.00 | 767.50 | 755.20 | 16.750 | 8.33% | 759.40 | 40.750 | 4.63 | 0.00 | 0.00 | 0.00 | 14.00 | Tunnel Outflow – 0.0MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2622.90ft | 61.652 | 41.35% | 2583.00 | 13.507 | 9.69 | 23.18 | 0.00 | 23.18 | 10.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1583.65 | 19.765 | 36.09% | 1583.20 | 19.090 | 5.05 | 2.21 | 0.00 | 2.21 | 4.00 | Sluice discharge/day – 0.02 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1193.30 | 7.0865 | 14.22% | 1194.34 | 8.8902 | 0.80 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 685.80 | 8.8000 | 18.57% | 694.65 | 21.4291 | 5.17 | 0.00 | 0.00 | 0.00 | 2.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 749.44 | 14.670 | 43.17% | 752.34 | 20.46 | 5.72 | 5.01 | 0.00 | 5.01 | 11.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.35 | 0.89 | 2.86% | 965.60 | 1.89 | 18.24 | 0.00 | 0.00 | 0.00 | 5.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 419.00 | 420.00 | 421.00 | 414.55 | 8.78 | 28.98% | 421.10 | 22.500 | 30.61 | 27.14 | 0.00 | 27.14 | 3.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1748.85 | 2.220 | 29.02% | 1748.40 | 2.044 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.324McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.65 | 3.530 | 54.90% | 451.20 | 3.300 | 7.16 | 6.57 | 0.00 | 6.57 | 12.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.30 | 0.7500 | 14.17% | 746.60 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.90 | 2.860 | 62.86% | 246.40 | 2.020 | 14.53 | 20.51 | 0.00 | 20.51 | 8.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.10 | 0.283 | 24.40% | 189.35 | 0.721 | 3.64 | 2.95 | 0.00 | 2.95 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.20 | 0.1387 | 18.18% | 818.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.150 | 38.46% | 847.05 | 0.250 | 4.39 | 4.81 | 0.00 | 4.81 | 2.50 |