Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2375.33 ft | 2367.33 | 2373.33 | 2374.33 | 2320.9ft | 342.472 | 23.47% | 2354.20ft | 720.912 | 139.80 | 16.68 | 0.00 | 16.68 | 12.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.50 | 160.00 | 160.50 | 161.00 | 139.12 | 292.280 | 28.72% | 147.67 | 463.740 | 97.50 | 4.54 | 0.00 | 4.54 | 21.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 952.16 | 123.840 | 27.74% | 960.08 | 183.280 | 78.58 | 6.82 | 0.00 | 6.82 | 9.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 771.00 | 769.50 | 770.00 | 770.50 | 760.10 | 45.350 | 22.56% | 765.50 | 88.950 | 23.15 | 0.00 | 0.00 | 0.00 | 3.80 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2626.10ft | 67.089 | 45.00% | 2607.60 | 39.485 | 10.03 | 0.00 | 0.00 | 0.00 | 14.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1585.15 | 22.015 | 40.20% | 1585.00 | 21.790 | 2.60 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1195.02 | 10.0696 | 20.21% | 1195.32 | 10.589 | 2.61 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 695.55 | 22.9338 | 48.38% | 701.50 | 33.1603 | 14.51 | 0.00 | 0.00 | 0.00 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.56 | 22.902 | 67.40% | 757.58 | 32.84 | 16.54 | 22.19 | 0.00 | 22.19 | 16.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 969.00 | 5.18 | 16.63% | 967.80 | 3.98 | 38.58 | 0.00 | 0.00 | 0.00 | 7.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.60 | 26.25 | 86.63% | 420.45 | 20.880 | 55.80 | 56.42 | 0.21 | 56.63 | 8.20 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1750.90 | 3.040 | 39.74% | 1749.75 | 2.580 | 1.16 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.75 | 4.665 | 72.55% | 455.60 | 5.839 | 30.83 | 44.33 | 3.39 | 47.72 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 747.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.40 | 3.454 | 75.91% | 253.00 | 4.550 | 88.05 | 97.84 | 2.89 | 100.73 | 1.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.40 | 0.405 | 34.91% | 187.00 | 0.466 | 18.28 | 16.36 | 0.00 | 16.36 | 3.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.70 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.150 | 38.46% | 847.15 | 0.272 | 9.30 | 9.16 | 0.00 | 9.16 | 2.80 |