Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2377.95 ft | 2369.95 | 2375.95 | 2376.95 | 2321.5ft | 348.877 | 23.90% | 2356.02ft | 743.279 | 103.63 | 28.14 | 0.00 | 28.14 | 15.80 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.75 | 160.25 | 160.75 | 161.25 | 139.37 | 297.030 | 29.18% | 148.58 | 483.569 | 65.61 | 10.05 | 0.00 | 10.05 | 8.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 952.85 | 128.330 | 28.74% | 961.12 | 192.120 | 64.98 | 13.02 | 0.00 | 13.02 | 1.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 760.25 | 46.350 | 23.06% | 766.35 | 97.350 | 11.57 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2626.40ft | 67.615 | 45.35% | 2610.90 | 43.758 | 8.43 | 2.34 | 0.00 | 2.34 | 9.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1585.25 | 22.165 | 40.47% | 1585.30 | 22.240 | 1.74 | 0.00 | 0.00 | 0.00 | 4.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1195.12 | 10.2430 | 20.56% | 1195.50 | 10.902 | 2.01 | 0.00 | 0.00 | 0.00 | 2.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 696.00 | 23.6861 | 49.97% | 702.75 | 35.6457 | 12.30 | 3.59 | 0.00 | 3.59 | 4.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.40 | 20.590 | 60.59% | 757.70 | 33.14 | 9.54 | 36.34 | 0.00 | 36.34 | 15.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 967.25 | 3.43 | 11.01% | 968.15 | 4.33 | 33.70 | 0.00 | 0.00 | 0.00 | 6.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.10 | 25.00 | 82.51% | 420.80 | 21.750 | 45.05 | 56.14 | 3.37 | 59.52 | 7.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1751.05 | 3.100 | 40.52% | 1749.95 | 2.660 | 0.93 | 0.00 | 0.00 | 0.00 | 4.40 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.35 | 3.377 | 52.52% | 455.70 | 5.902 | 11.44 | 43.59 | 0.00 | 43.59 | 5.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 748.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 247.00 | 2.200 | 48.35% | 253.00 | 4.550 | 85.41 | 99.93 | 0.00 | 99.93 | 6.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.25 | 0.302 | 25.99% | 187.70 | 0.539 | 21.94 | 14.01 | 0.00 | 14.01 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 820.80 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 847.15 | 0.272 | 9.97 | 10.25 | 0.00 | 10.25 | 3.40 |