Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2380.58 ft | 2372.58 | 2378.58 | 2379.58 | 2331.36ft | 454.194 | 31.12% | 2371.72ft | 958.593 | 98.40 | 13.02 | 0.00 | 13.02 | 7.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 162.50 | 161.00 | 161.50 | 162.00 | 145.03 | 407.630 | 40.05% | 156.42 | 666.080 | 83.13 | 0.00 | 0.00 | 0.00 | 1.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 957.50 | 161.900 | 36.26% | 970.20 | 282.150 | 46.60 | 10.49 | 0.00 | 10.49 | 2.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 767.20 | 105.750 | 52.61% | 772.15 | 159.350 | 16.20 | 0.00 | 0.00 | 0.00 | 2.40 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2632.10ft | 77.801 | 52.18% | 2653.10 | 122.830 | 13.79 | 0.93 | 0.00 | 0.93 | 5.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1587.35 | 26.040 | 47.54% | 1592.45 | 36.240 | 3.47 | 0.00 | 0.00 | 0.00 | 3.60 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.33 | 12.3416 | 24.77% | 1200.29 | 23.836 | 1.41 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 699.00 | 28.5109 | 60.15% | 706.95 | 45.3330 | 11.94 | 1.77 | 0.00 | 1.77 | 4.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.43 | 22.600 | 66.51% | 754.47 | 25.07 | 25.89 | 26.55 | 0.00 | 26.55 | 9.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.95 | 2.17 | 6.97% | 971.05 | 7.23 | 27.95 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.65 | 26.37 | 87.03% | 421.85 | 24.380 | 62.40 | 56.48 | 0.00 | 56.48 | 1.60 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1753.35 | 4.175 | 54.58% | 1756.90 | 6.130 | 1.16 | 0.00 | 0.00 | 0.00 | 0.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.40 | 4.443 | 69.10% | 455.95 | 6.061 | 29.68 | 32.78 | 0.00 | 32.78 | 1.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 1.0141 | 19.16% | 747.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.20 | 3.372 | 74.11% | 253.00 | 4.550 | 83.37 | 79.72 | 0.00 | 79.72 | 3.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.25 | 0.208 | 17.89% | 190.10 | 0.810 | 11.71 | 12.55 | 0.00 | 12.55 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.60 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.85 | 0.201 | 51.54% | 846.90 | 0.213 | 8.91 | 8.64 | 0.00 | 8.64 | 2.00 |