Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2386.81 ft | 2378.81 | 2384.81 | 2385.81 | 2331.48ft | 455.475 | 31.21% | 2385.42ft | 1165.902 | 19.39 | 35.22 | 0.00 | 35.22 | 7.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.50 | 162.00 | 162.50 | 163.00 | 145.70 | 421.700 | 41.43% | 163.26 | 852.262 | 23.23 | 27.84 | 0.00 | 27.84 | 3.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.00 | 974.00 | 975.00 | 975.50 | 957.07 | 158.470 | 35.49% | 975.98 | 357.520 | 14.00 | 21.29 | 0.00 | 21.29 | 11.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.50 | 773.00 | 773.50 | 774.00 | 769.05 | 124.550 | 61.97% | 774.30 | 184.950 | 9.26 | 0.00 | 0.00 | 0.00 | 12.20 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2640.50ft | 94.190 | 63.18% | 2660.50 | 142.024 | 9.16 | 6.78 | 0.00 | 6.78 | 2.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.55 | 28.440 | 51.93% | 1597.85 | 49.565 | 1.16 | 0.00 | 0.00 | 0.00 | 2.80 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.94 | 13.3995 | 26.89% | 1205.49 | 43.135 | 0.20 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 695.90 | 23.5189 | 49.62% | 706.75 | 44.684 | 2.71 | 10.45 | 0.00 | 10.45 | 8.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 745.69 | 8.427 | 24.80% | 755.90 | 28.65 | 5.08 | 7.73 | 0.00 | 7.73 | 44.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.00 | 0.61 | 1.96% | 978.00 | 16.63 | 5.63 | 0.00 | 0.00 | 0.00 | 16.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.20 | 15.53 | 51.25% | 419.50 | 18.500 | 7.63 | 11.37 | 0.00 | 11.37 | 0.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1755.05 | 5.025 | 65.69% | 1758.10 | 6.970 | 0.29 | 0.00 | 0.00 | 0.00 | 2.40 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.20 | 3.301 | 51.34% | 456.00 | 6.092 | 15.44 | 16.62 | 0.00 | 16.62 | 20.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 747.50 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.70 | 3.173 | 69.74% | 252.00 | 4.120 | 25.92 | 25.92 | 0.00 | 25.92 | 19.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.80 | 0.446 | 38.45% | 186.50 | 0.415 | 13.98 | 19.56 | 0.00 | 19.56 | 3.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 846.30 | 0.071 | 4.69 | 5.10 | 0.00 | 5.10 | 0.80 |