Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2386.81 ft | 2378.81 | 2384.81 | 2385.81 | 2330.40ft | 443.945 | 30.42% | 2384.46ft | 1150.005 | 19.05 | 64.55 | 0.00 | 64.55 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.50 | 162.00 | 162.50 | 163.00 | 145.49 | 417.290 | 41.00% | 163.03 | 845.661 | 14.98 | 43.17 | 0.00 | 43.17 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.00 | 974.00 | 975.00 | 975.50 | 956.40 | 153.350 | 34.34% | 976.08 | 358.920 | 14.75 | 35.58 | 0.00 | 35.58 | 73.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.50 | 773.00 | 773.50 | 774.00 | 769.10 | 125.150 | 62.26% | 774.25 | 184.250 | 6.48 | 13.43 | 0.00 | 13.43 | 0.00 | Tunnel Outflow – 1.16 MCM (11.69cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2643.10ft | 99.721 | 66.89% | 2660.10 | 140.903 | 20.55 | 3.31 | 0.00 | 3.31 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.70 | 28.740 | 52.47% | 1597.65 | 49.165 | 1.16 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1197.05 | 13.5903 | 27.27% | 1205.96 | 45.194 | 1.20 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.35 | 20.9275 | 44.15% | 706.80 | 44.846 | 8.96 | 15.73 | 0.00 | 15.73 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 746.30 | 9.340 | 27.49% | 754.14 | 24.23 | 27.72 | 12.37 | 0.00 | 12.37 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.85 | 0.49 | 1.57% | 977.10 | 15.28 | 4.18 | 0.00 | 0.00 | 0.00 | 3.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.75 | 12.60 | 41.58% | 420.10 | 20.000 | 9.29 | 16.24 | 0.00 | 16.24 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1755.30 | 5.150 | 67.32% | 1758.10 | 6.970 | 0.29 | 0.00 | 0.00 | 0.00 | 1.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.95 | 3.683 | 57.28% | 456.15 | 6.188 | 18.55 | 19.73 | 0.00 | 19.73 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 747.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.90 | 3.251 | 71.45% | 253.00 | 4.550 | 25.44 | 24.99 | 0.00 | 24.99 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.55 | 0.420 | 36.21% | 188.95 | 0.676 | 26.60 | 26.17 | 0.00 | 26.17 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.142 | 36.41% | 846.20 | 0.047 | 4.87 | 4.73 | 0.00 | 4.73 | 0.00 |