Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2392.55 ft | 2384.55 | 2390.55 | 2391.55 | 2329.18ft | 430.921 | 29.53% | 2385.80ft | 1172.192 | 52.69 | 11.65 | 0.00 | 11.65 | 13.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 165.00 | 163.50 | 164.00 | 164.50 | 145.82 | 424.220 | 41.68% | 164.71 | 893.948 | 52.47 | 8.72 | 0.00 | 8.72 | 96.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.40 | 974.40 | 975.40 | 975.90 | 959.65 | 179.630 | 40.23% | 976.63 | 366.840 | 56.49 | 5.33 | 0.00 | 5.33 | 10.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 768.55 | 119.150 | 59.28% | 774.00 | 181.650 | 4.63 | 0.00 | 0.00 | 0.00 | 12.00 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2651.20ft | 118.220 | 79.29% | 2662.90 | 148.806 | 26.95 | 7.66 | 0.00 | 7.66 | 38.40 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1589.50 | 30.340 | 55.40% | 1597.80 | 49.440 | 1.16 | 0.00 | 0.00 | 0.00 | 11.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1197.68 | 15.5240 | 31.15% | 1207.33 | 51.435 | 1.47 | 0.00 | 0.00 | 0.00 | 3.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 691.50 | 16.3410 | 34.47% | 706.90 | 45.171 | 12.12 | 2.98 | 0.00 | 2.98 | 8.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.29 | 12.610 | 37.11% | 754.04 | 24.00 | 9.19 | 5.61 | 0.00 | 5.61 | 44.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 966.30 | 2.48 | 7.96% | 978.30 | 17.08 | 27.74 | 0.00 | 0.00 | 0.00 | 4.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 414.15 | 8.17 | 26.96% | 420.75 | 21.630 | 80.53 | 6.28 | 0.00 | 6.28 | 18.60 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1757.10 | 6.270 | 81.96% | 1758.35 | 7.160 | 1.27 | 0.00 | 0.00 | 0.00 | 3.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.60 | 4.015 | 62.44% | 456.25 | 6.251 | 13.19 | 11.42 | 0.00 | 11.42 | 11.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.70 | 0.8313 | 15.71% | 748.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.60 | 2.744 | 60.31% | 253.00 | 4.550 | 22.55 | 23.91 | 0.00 | 23.91 | 13.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 187.45 | 0.513 | 44.22% | 190.85 | 0.919 | 14.35 | 16.51 | 0.00 | 16.51 | 5.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.90 | 0.1802 | 23.62% | 820.50 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | 846.90 | 0.213 | 8.12 | 7.70 | 0.00 | 7.70 | 2.40 |