Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2392.55 ft | 2384.55 | 2390.55 | 2391.55 | 2330.16ft | 441.383 | 30.24% | 2386.44ft | 1182.784 | 84.48 | 1.42 | 0.00 | 1.42 | 42.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 165.00 | 163.50 | 164.00 | 164.50 | 146.38 | 435.980 | 42.84% | 165.00 | 902.300 | 73.16 | 0.00 | 0.00 | 0.00 | 38.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.40 | 974.40 | 975.40 | 975.90 | 960.71 | 188.640 | 42.25% | 976.68 | 367.560 | 58.10 | 0.00 | 0.00 | 0.00 | 64.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 768.95 | 123.550 | 61.47% | 774.05 | 182.150 | 37.04 | 0.00 | 0.00 | 0.00 | 41.60 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2653.20ft | 123.077 | 82.55% | 2663.00 | 149.080 | 32.88 | 4.67 | 0.00 | 4.67 | 51.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1589.70 | 30.740 | 56.13% | 1597.90 | 49.690 | 2.31 | 0.00 | 0.00 | 0.00 | 30.40 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1197.90 | 16.2246 | 32.56% | 1207.36 | 51.589 | 6.27 | 0.00 | 0.00 | 0.00 | 40.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 693.45 | 19.4229 | 40.98% | 706.75 | 44.684 | 22.41 | 1.36 | 0.00 | 1.36 | 70.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.78 | 17.360 | 51.09% | 754.26 | 24.57 | 40.10 | 0.98 | 0.00 | 0.98 | 144.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 966.35 | 2.53 | 8.12% | 979.65 | 19.11 | 29.27 | 0.00 | 0.00 | 0.00 | 37.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.00 | 9.45 | 31.19% | 421.00 | 22.250 | 88.60 | 17.30 | 0.00 | 17.30 | 55.60 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1757.35 | 6.445 | 84.25% | 1758.20 | 7.045 | 0.81 | 0.00 | 0.00 | 0.00 | 13.60 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.75 | 4.665 | 72.55% | 456.20 | 6.219 | 34.69 | 28.34 | 0.00 | 28.34 | 85.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 748.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.10 | 2.939 | 64.59% | 253.00 | 4.550 | 58.87 | 55.26 | 0.00 | 55.26 | 92.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.10 | 0.580 | 50.00% | 190.70 | 0.899 | 13.83 | 11.36 | 0.00 | 11.36 | 39.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.90 | 0.1802 | 23.62% | 820.60 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 846.60 | 0.142 | 10.09 | 10.77 | 0.00 | 10.77 | 27.20 |