Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2396.94 ft | 2388.94 | 2394.94 | 2395.94 | 2338.36ft | 528.979 | 36.24% | 2385.74ft | 1171.199 | 43.47 | 9.84 | 0.00 | 9.84 | 23.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.30 | 164.80 | 165.30 | 165.80 | 150.46 | 525.994 | 51.68% | 164.55 | 889.340 | 41.41 | 0.92 | 0.00 | 0.92 | 3.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.91 | 974.91 | 975.91 | 976.41 | 967.03 | 245.570 | 55.00% | 975.92 | 356.680 | 29.93 | 4.35 | 0.00 | 4.35 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 771.00 | 146.350 | 72.81% | 774.20 | 183.750 | 11.57 | 0.00 | 0.00 | 0.00 | 9.20 | Tunnel Outflow -1.00 MCM (11.57cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.08 | 2659.72 | 2661.36 | 2661.00ft | 143.426 | 96.20% | 2661.70 | 145.408 | 10.72 | 14.01 | 0.00 | 14.01 | 3.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1591.15 | 33.640 | 61.42% | 1596.75 | 46.815 | 1.16 | 0.00 | 0.00 | 0.00 | 2.40 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1199.15 | 20.2052 | 40.55% | 1207.12 | 50.353 | 2.58 | 0.00 | 0.00 | 0.00 | 4.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 701.90 | 33.9556 | 71.64% | 706.90 | 45.171 | 6.84 | 2.24 | 0.00 | 2.24 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.16 | 22.110 | 65.07% | 752.86 | 21.50 | 6.17 | 13.94 | 0.00 | 13.94 | 1.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 967.90 | 4.08 | 13.10% | 976.20 | 13.93 | 12.67 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.30 | 15.75 | 51.98% | 421.45 | 23.380 | 37.42 | 47.37 | 0.00 | 47.37 | 1.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.45 | 7.240 | 94.64% | 1758.05 | 6.935 | 3.47 | 0.00 | 3.47 | 3.47 | 0.40 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.80 | 4.120 | 64.07% | 453.90 | 4.760 | 9.78 | 12.14 | 0.00 | 12.14 | 3.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.80 | 2.820 | 61.98% | 248.70 | 2.780 | 34.25 | 36.95 | 0.00 | 36.95 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.20 | 0.385 | 33.19% | 188.30 | 0.601 | 8.56 | 8.97 | 0.00 | 8.97 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.20 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.150 | 38.46% | 846.65 | 0.150 | 10.14 | 9.46 | 0.00 | 9.46 | 0.00 |