Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2396.94 ft | 2388.94 | 2394.94 | 2395.94 | 2339.02ft | 536.024 | 36.73% | 2385.34ft | 1164.578 | 62.48 | 9.08 | 0.00 | 9.08 | 37.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.30 | 164.80 | 165.30 | 165.80 | 150.84 | 534.799 | 52.54% | 164.25 | 880.700 | 69.86 | 0.00 | 0.00 | 0.00 | 44.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.91 | 974.91 | 975.91 | 976.41 | 967.48 | 250.330 | 56.06% | 975.68 | 353.320 | 35.05 | 0.90 | 0.00 | 0.90 | 42.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 771.15 | 148.050 | 73.66% | 774.00 | 181.650 | 19.68 | 0.00 | 0.00 | 0.00 | 33.20 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.08 | 2659.72 | 2661.36 | 2660.80ft | 142.865 | 95.83% | 2661.20 | 143.992 | 14.81 | 14.81 | 0.00 | 14.81 | 52.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1591.30 | 33.940 | 61.97% | 1596.75 | 46.815 | 2.31 | 0.00 | 0.00 | 0.00 | 13.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1199.25 | 20.5237 | 41.19% | 1207.12 | 50.353 | 1.84 | 0.00 | 0.00 | 0.00 | 12.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 701.95 | 34.0551 | 71.85% | 706.60 | 44.197 | 10.17 | 5.56 | 0.00 | 5.56 | 22.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.34 | 20.460 | 60.21% | 752.58 | 20.95 | 17.47 | 20.27 | 0.00 | 20.27 | 83.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 968.10 | 4.28 | 13.74% | 975.85 | 13.44 | 14.51 | 0.00 | 0.00 | 0.00 | 43.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 418.10 | 15.32 | 50.56% | 421.20 | 22.75 | 60.22 | 48.47 | 0.00 | 48.47 | 60.80 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.40 | 7.200 | 94.12% | 1758.05 | 6.935 | 3.47 | 0.00 | 3.47 | 3.47 | 2.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.00 | 3.709 | 57.68% | 453.70 | 4.634 | 20.90 | 20.31 | 0.00 | 20.31 | 41.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.00 | 2.510 | 55.16% | 249.20 | 2.978 | 40.61 | 36.68 | 0.00 | 36.68 | 43.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.10 | 0.580 | 50.00% | 187.95 | 0.564 | 6.82 | 6.68 | 0.00 | 6.68 | 27.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 820.20 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 847.00 | 0.236 | 60.51% | 846.65 | 0.154 | 9.22 | 8.26 | 0.00 | 8.26 | 4.80 |