Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2397.78 ft | 2389.78 | 2395.78 | 2396.78 | 2341.38ft | 563.446 | 38.61% | 2385.04ft | 1159.613 | 245.61 | 8.11 | 0.00 | 8.11 | 65.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.60 | 165.10 | 165.60 | 166.10 | 151.71 | 554.944 | 54.52% | 163.93 | 871.491 | 153.23 | 5.80 | 0.00 | 5.80 | 73.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 977.95 | 975.95 | 976.95 | 977.45 | 968.44 | 261.160 | 58.49% | 975.44 | 349.960 | 92.25 | 5.09 | 0.00 | 5.09 | 102.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 771.65 | 154.050 | 76.64% | 773.85 | 179.750 | 47.45 | 0.00 | 0.00 | 0.00 | 66.60 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2661.10ft | 143.710 | 96.39% | 2660.80 | 142.870 | 24.50 | 14.77 | 0.00 | 14.77 | 35.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1591.65 | 34.640 | 63.25% | 1596.80 | 46.940 | 5.79 | 0.00 | 0.00 | 0.00 | 32.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1199.42 | 21.0650 | 42.27% | 1207.11 | 50.301 | 4.79 | 0.00 | 0.00 | 0.00 | 25.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 703.20 | 36.5404 | 77.09% | 706.35 | 43.553 | 16.11 | 0.00 | 0.00 | 0.00 | 63.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.00 | 21.804 | 64.17% | 752.31 | 20.40 | 33.60 | 15.97 | 0.00 | 15.97 | 81.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 970.25 | 6.43 | 20.64% | 975.60 | 13.03 | 34.07 | 0.00 | 0.00 | 0.00 | 94.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 419.40 | 18.25 | 60.23% | 421.55 | 23.63 | 73.63 | 53.34 | 0.00 | 53.34 | 46.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.45 | 7.240 | 94.64% | 1758.05 | 6.935 | 3.01 | 0.00 | 3.47 | 3.47 | 18.60 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 454.30 | 5.014 | 77.98% | 452.00 | 3.709 | 46.10 | 34.24 | 0.00 | 34.24 | 69.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9757 | 18.44% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.80 | 3.618 | 79.52% | 249.40 | 3.056 | 71.31 | 63.90 | 0.00 | 63.90 | 56.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 189.10 | 0.693 | 59.74% | 187.60 | 0.529 | 19.47 | 17.44 | 0.00 | 17.44 | 71.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 820.20 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | 846.75 | 0.177 | 10.90 | 10.35 | 0.00 | 10.35 | 19.80 |