Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2397.78 ft | 2389.78 | 2395.78 | 2396.78 | 2345.80ft | 617.737 | 42.33% | 2384.86ft | 1156.632 | 150.86 | 15.65 | 0.00 | 15.65 | 2.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.60 | 165.10 | 165.60 | 166.10 | 152.94 | 583.430 | 57.32% | 163.52 | 859.724 | 87.77 | 14.83 | 0.00 | 14.83 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 977.95 | 975.95 | 976.95 | 977.45 | 970.48 | 285.510 | 63.94% | 975.44 | 349.960 | 74.21 | 17.27 | 0.00 | 17.27 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 772.10 | 158.950 | 79.08% | 773.60 | 176.350 | 17.36 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow -0.00 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2661.50ft | 144.790 | 97.12% | 2660.10 | 140.903 | 14.92 | 14.92 | 0.00 | 14.92 | 3.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1592.00 | 35.340 | 64.52% | 1596.70 | 46.690 | 2.31 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1199.66 | 21.8293 | 43.81% | 1207.09 | 50.198 | 2.95 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 704.60 | 39.4930 | 83.32% | 706.10 | 42.973 | 16.75 | 11.38 | 0.00 | 11.38 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.92 | 21.623 | 63.63% | 752.25 | 20.28 | 8.74 | 13.65 | 0.00 | 13.65 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.75 | 10.43 | 33.48% | 976.00 | 13.63 | 28.83 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.90 | 27.00 | 89.11% | 420.60 | 21.25 | 77.43 | 54.97 | 0.00 | 54.97 | 0.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.40 | 7.200 | 94.12% | 1758.05 | 6.935 | 3.47 | 0.00 | 3.47 | 3.47 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 454.40 | 5.078 | 78.97% | 452.50 | 3.964 | 36.30 | 22.23 | 0.00 | 22.23 | 1.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9757 | 18.44% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.70 | 3.173 | 69.74% | 248.50 | 2.705 | 63.00 | 63.00 | 0.00 | 63.00 | 7.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.80 | 0.254 | 21.90% | 187.00 | 0.466 | 24.13 | 22.19 | 0.00 | 22.19 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 820.20 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 847.15 | 0.272 | 7.95 | 8.50 | 0.00 | 8.50 | 0.00 |