Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2398.85 ft | 2390.85 | 2396.85 | 2397.85 | 2348.36ft | 649.170 | 44.48% | 2384.32ft | 1147.686 | 52.59 | 13.93 | 0.00 | 13.93 | 30.80 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 166.80 | 165.30 | 165.80 | 166.30 | 153.74 | 602.328 | 59.18% | 162.27 | 823.995 | 56.37 | 12.02 | 0.00 | 12.02 | 15.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 978.83 | 976.83 | 977.83 | 978.33 | 971.71 | 300.730 | 67.35% | 975.50 | 350.800 | 31.85 | 24.56 | 0.00 | 24.56 | 6.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 772.25 | 160.750 | 79.98% | 772.80 | 167.350 | 1.50 | 13.08 | 0.00 | 13.08 | 0.00 | Tunnel Outflow -1.13 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2660.00ft | 140.620 | 94.32% | 2659.30 | 138.720 | 8.37 | 14.84 | 0.00 | 14.84 | 2.30 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.10 | 37.690 | 68.82% | 1596.60 | 46.440 | 2.89 | 0.00 | 0.00 | 0.00 | 1.20 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1200.59 | 24.7909 | 49.75% | 1207.20 | 50.765 | 4.42 | 0.00 | 0.00 | 0.00 | 7.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 704.00 | 38.1311 | 80.45% | 706.20 | 43.205 | 17.88 | 20.22 | 0.00 | 20.22 | 14.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.60 | 16.810 | 49.47% | 751.61 | 19.00 | 19.44 | 11.57 | 0.00 | 11.57 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 971.80 | 8.06 | 25.87% | 977.70 | 16.18 | 3.94 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.10 | 11.30 | 37.29% | 414.15 | 8.17 | 37.79 | 47.05 | 0.00 | 47.05 | 12.80 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.45 | 7.240 | 94.64% | 1758.10 | 6.970 | 3.47 | 0.00 | 3.47 | 3.47 | 1.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.00 | 4.219 | 65.61% | 453.10 | 4.270 | 30.32 | 31.51 | 0.00 | 31.51 | 12.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 747.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.20 | 2.978 | 65.45% | 249.50 | 3.095 | 48.40 | 51.11 | 0.00 | 51.11 | 17.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 187.00 | 0.466 | 40.17% | 188.55 | 0.629 | 21.38 | 25.02 | 0.00 | 25.02 | 38.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.80 | 0.189 | 48.46% | 846.45 | 0.106 | 10.25 | 10.11 | 0.00 | 10.11 | 1.90 |