Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.79 ft | 2391.79 | 2397.79 | 2398.79 | 2355.34ft | 734.922 | 50.35% | 2386.14ft | 1177.819 | 39.16 | 23.26 | 0.00 | 23.26 | 1.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 155.62 | 646.971 | 63.57% | 161.38 | 798.754 | 20.78 | 6.60 | 0.00 | 6.60 | 33.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 980.56 | 978.56 | 979.56 | 980.06 | 973.15 | 319.450 | 71.54% | 977.16 | 374.520 | 19.26 | 14.75 | 0.00 | 14.75 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.80 | 155.550 | 77.39% | 771.90 | 156.350 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2658.60ft | 136.840 | 91.78% | 2658.90 | 137.640 | 18.69 | 12.56 | 0.00 | 12.56 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1594.85 | 42.065 | 76.80% | 1598.45 | 51.290 | 1.45 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1202.47 | 30.7777 | 61.77% | 1207.13 | 50.404 | 2.58 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.05 | 42.8566 | 90.41% | 706.00 | 42.741 | 17.62 | 20.31 | 0.00 | 20.31 | 9.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.09 | 19.980 | 58.80% | 752.52 | 20.83 | 1.98 | 9.75 | 0.00 | 9.75 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.20 | 9.74 | 31.27% | 977.50 | 15.88 | 3.51 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 419.00 | 17.25 | 56.93% | 413.05 | 6.53 | 17.75 | 14.01 | 0.00 | 14.01 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.35 | 7.160 | 93.59% | 1758.05 | 6.935 | 3.01 | 0.00 | 3.47 | 3.47 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.10 | 4.270 | 66.41% | 453.15 | 4.296 | 27.89 | 30.27 | 0.00 | 30.27 | 24.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.30 | 1.0527 | 19.89% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.50 | 3.495 | 76.81% | 248.40 | 2.666 | 53.28 | 54.70 | 0.00 | 54.70 | 6.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.25 | 0.302 | 26.03% | 188.20 | 0.590 | 13.00 | 13.51 | 0.00 | 13.51 | 5.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.165 | 42.31% | 846.75 | 0.177 | 6.27 | 5.86 | 0.00 | 5.86 | 17.80 |