Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2399.79 ft | 2391.79 | 2397.79 | 2398.79 | 2357.70 | 763.906 | 52.34% | 2386.00ft | 1175.502 | 58.58 | 17.17 | 0.00 | 17.17 | 0.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 156.88 | 677.120 | 66.53% | 160.90 | 785.200 | 42.37 | 8.52 | 0.00 | 8.52 | 37.60 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 980.56 | 978.56 | 979.56 | 980.06 | 973.66 | 326.080 | 73.03% | 976.97 | 371.770 | 22.82 | 9.28 | 0.00 | 9.28 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 772.05 | 158.350 | 78.78% | 771.90 | 156.350 | 10.42 | 0.00 | 0.00 | 0.00 | 4.40 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2660.90ft | 143.150 | 96.02% | 2659.40 | 138.990 | 13.84 | 13.84 | 0.00 | 13.84 | 20.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.85 | 44.565 | 81.37% | 1598.55 | 51.590 | 6.83 | 4.80 | 0.00 | 4.80 | 1.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1204.40 | 38.3596 | 76.98% | 1207.18 | 50.662 | 10.65 | 0.00 | 0.00 | 0.00 | 6.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.85 | 45.0087 | 94.96% | 706.90 | 45.171 | 42.04 | 20.31 | 23.61 | 43.92 | 2.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.39 | 18.570 | 54.65% | 750.66 | 17.11 | 9.13 | 4.90 | 0.00 | 4.90 | 15.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.85 | 10.55 | 33.87% | 977.25 | 15.51 | 7.59 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.00 | 22.25 | 73.43% | 414.15 | 8.17 | 55.09 | 21.82 | 0.00 | 21.82 | 14.60 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.45 | 7.240 | 94.64% | 1758.05 | 6.935 | 6.37 | 0.00 | 4.63 | 4.63 | 2.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 456.30 | 6.281 | 97.68% | 452.70 | 4.066 | 70.32 | 44.58 | 25.75 | 70.32 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.70 | 1.2077 | 22.82% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 252.00 | 4.120 | 90.55% | 249.60 | 3.134 | 93.06 | 97.36 | 0.67 | 98.03 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.35 | 0.400 | 34.48% | 188.35 | 0.606 | 10.85 | 13.42 | 0.00 | 13.42 | 1.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | 846.60 | 0.142 | 9.70 | 10.25 | 0.00 | 10.25 | 0.00 |