Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2400.03 ft | 2392.03 | 2398.03 | 2399.03 | 2359.04 | 780.365 | 53.47% | 2385.40ft | 1165.571 | 57.81 | 7.77 | 0.00 | 7.77 | 21.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 157.45 | 691.250 | 67.92% | 160.91 | 785.480 | 27.16 | 0.53 | 0.00 | 0.53 | 2.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.00 | 979.00 | 980.00 | 980.50 | 974.11 | 331.930 | 74.34% | 976.66 | 367.270 | 17.85 | 4.31 | 0.00 | 4.31 | 11.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 772.10 | 158.950 | 79.08% | 771.95 | 156.950 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2659.50ft | 139.260 | 93.41% | 2660.20 | 141.180 | 4.81 | 14.31 | 0.00 | 14.31 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.90 | 44.690 | 81.60% | 1598.80 | 52.340 | 3.85 | 5.29 | 0.00 | 5.29 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1205.02 | 41.0758 | 82.43% | 1207.23 | 50.920 | 4.06 | 0.00 | 0.00 | 0.00 | 10.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.60 | 44.1972 | 93.24% | 707.00 | 45.496 | 20.31 | 20.31 | 0.00 | 20.31 | 20.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.66 | 17.110 | 50.35% | 750.66 | 16.13 | 1.63 | 6.57 | 0.00 | 6.57 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 974.25 | 11.01 | 35.35% | 976.85 | 14.91 | 6.56 | 0.00 | 0.00 | 0.00 | 3.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.75 | 24.13 | 79.64% | 415.50 | 10.28 | 13.99 | 18.33 | 0.00 | 18.33 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.089 | 92.67% | 1758.15 | 7.005 | 4.63 | 0.00 | 4.63 | 4.63 | 0.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.90 | 4.760 | 74.03% | 454.50 | 5.141 | 26.82 | 27.92 | 0.00 | 27.92 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 747.00 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.00 | 2.900 | 63.74% | 248.20 | 2.588 | 45.20 | 45.20 | 0.00 | 45.20 | 8.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.70 | 0.336 | 28.97% | 186.80 | 0.466 | 5.37 | 3.87 | 0.00 | 3.87 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 847.00 | 0.236 | 60.51% | 846.65 | 0.154 | 9.52 | 9.39 | 0.00 | 9.39 | 0.00 |