Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2400.03 ft | 2392.03 | 2398.03 | 2399.03 | 2359.98ft | 791.917 | 54.26% | 2384.46ft | 1150.005 | 47.80 | 14.84 | 0.00 | 14.84 | 23.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 157.77 | 699.250 | 68.70% | 160.76 | 781.280 | 19.88 | 4.68 | 0.00 | 4.68 | 3.60 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.00 | 979.00 | 980.00 | 980.50 | 974.84 | 341.640 | 76.51% | 976.45 | 364.230 | 26.08 | 8.95 | 0.00 | 8.95 | 18.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.70 | 154.750 | 76.99% | 771.95 | 156.950 | 2.89 | 12.15 | 0.00 | 12.15 | 0.00 | Tunnel Outflow – 1.05MCM (12.38cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2658.40ft | 136.310 | 91.43% | 2659.00 | 137.910 | 12.28 | 12.28 | 0.00 | 12.28 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.60 | 43.940 | 80.23% | 1598.75 | 52.190 | 2.16 | 4.76 | 0.00 | 4.76 | 16.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1205.38 | 42.6529 | 85.60% | 1207.14 | 50.456 | 3.04 | 0.00 | 0.00 | 0.00 | 11.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 706.50 | 43.9004 | 92.62% | 705.95 | 42.625 | 23.00 | 20.31 | 0.00 | 20.31 | 16.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.95 | 21.680 | 63.80% | 749.08 | 13.98 | 14.43 | 8.08 | 0.00 | 8.08 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 975.05 | 12.21 | 39.20% | 976.60 | 14.53 | 8.95 | 0.00 | 0.00 | 0.00 | 27.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.70 | 24.00 | 79.21% | 415.80 | 10.77 | 12.34 | 9.45 | 0.00 | 9.45 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.20 | 7.045 | 92.09% | 1758.05 | 6.935 | 4.63 | 0.00 | 4.63 | 4.63 | 4.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.20 | 4.321 | 67.20% | 452.70 | 4.066 | 37.19 | 33.65 | 0.00 | 33.65 | 12.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.50 | 1.1302 | 21.36% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.00 | 3.290 | 72.31% | 249.70 | 3.173 | 50.20 | 49.75 | 0.00 | 49.75 | 5.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.85 | 0.451 | 38.88% | 187.45 | 0.513 | 12.42 | 10.73 | 0.00 | 10.73 | 34.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 820.30 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.142 | 36.41% | 846.50 | 0.118 | 8.58 | 9.54 | 0.00 | 9.54 | 8.50 |