Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2400.03 ft | 2392.03 | 2398.03 | 2399.03 | 2361.32ft | 810.899 | 55.56% | 2384.10ft | 1144.042 | 98.07 | 8.55 | 0.00 | 8.55 | 4.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 168.50 | 167.00 | 167.50 | 168.00 | 157.92 | 703.000 | 69.07% | 160.67 | 778.760 | 18.15 | 3.26 | 0.00 | 3.26 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.00 | 979.00 | 980.00 | 980.50 | 975.32 | 348.280 | 78.00% | 976.27 | 361.620 | 40.29 | 15.98 | 0.00 | 15.98 | 3.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 771.70 | 154.750 | 76.99% | 771.90 | 156.350 | 11.81 | 11.81 | 0.00 | 11.81 | 0.00 | Tunnel Outflow – 1.02MCM (12.38cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2658.70ft | 137.110 | 91.97% | 2658.90 | 137.640 | 17.92 | 14.84 | 0.00 | 14.84 | 2.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.50 | 43.690 | 79.77% | 1598.75 | 52.190 | 3.99 | 5.43 | 0.00 | 5.43 | 7.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1205.72 | 44.1424 | 88.59% | 1207.10 | 50.250 | 7.10 | 0.00 | 0.00 | 0.00 | 24.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 707.00 | 45.4956 | 95.98% | 705.60 | 41.813 | 69.80 | 20.32 | 0.00 | 20.32 | 10.00 | Gates opend @ 7 AM on 23.11.2023, Gate 1-0cm,Gate2&3-30cm, | |
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.29 | 24.610 | 72.42% | 748.89 | 13.36 | 19.79 | 4.24 | 0.00 | 4.24 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 975.55 | 12.96 | 41.61% | 976.40 | 14.23 | 9.21 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.25 | 25.38 | 83.76% | 416.30 | 11.70 | 23.51 | 13.38 | 0.00 | 13.38 | 0.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1758.05 | 6.935 | 4.63 | 0.00 | 4.63 | 4.63 | 11.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 456.40 | 6.330 | 98.44% | 452.80 | 4.120 | 100.70 | 37.98 | 48.94 | 86.92 | 6.00 | Gate opening status, UV#3&4-30cm | |||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 748.30 | 1.4402 | 27.21% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 253.00 | 4.550 | 100.00% | 248.40 | 2.670 | 153.72 | 62.34 | 91.38 | 153.72 | 3.00 | Gate opening status, UV#1-10cm ,UV#2-20cm, | |||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.40 | 0.405 | 34.91% | 187.20 | 0.487 | 17.19 | 17.18 | 0.00 | 17.18 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.70 | 0.2106 | 27.60% | 820.30 | Gate no.3 Opned at 11.10 pm 22.11.23 and closed at 6.05 am on 23.11.2023 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.210 | 53.85% | 846.85 | 0.200 | 9.41 | 9.41 | 0.00 | 9.41 | 10.00 |