Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2365.14ft | 865.143 | 59.28% | 2370.66ft | 943.535 | 20.13 | 37.71 | 0.00 | 37.71 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 156.94 | 678.560 | 66.67% | 156.19 | 660.560 | 10.20 | 34.85 | 0.00 | 34.85 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 975.56 | 351.640 | 78.75% | 973.37 | 322.310 | 10.95 | 23.92 | 0.00 | 23.92 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 769.30 | 127.250 | 63.31% | 768.75 | 121.350 | 0.00 | 11.11 | 0.00 | 11.11 | 0.00 | Tunnel Outflow -0.96MCM (11.11Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2654.30ft | 125.800 | 84.38% | 2661.40ft | 144.560 | 6.49 | 12.26 | 0.00 | 12.26 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1598.10 | 50.240 | 91.73% | 1598.20 | 50.540 | 2.78 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.21McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.06 | 50.0438 | 100.43% | 1207.04 | 49.941 | 1.61 | 0.00 | 0.42 | 0.42 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.75 | 42.1607 | 88.95% | 705.85 | 42.393 | 10.16 | 10.17 | 0.00 | 10.17 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.86 | 23.540 | 69.28% | 750.94 | 17.66 | 14.24 | 9.65 | 0.00 | 9.65 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 975.65 | 13.11 | 42.09% | 973.45 | 10.04 | 3.01 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.40 | 20.75 | 68.48% | 415.50 | 10.28 | 6.80 | 9.69 | 0.00 | 9.69 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.20 | 7.045 | 92.09% | 1757.96 | 7.045 | 2.31 | 0.00 | 2.31 | 2.31 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.50 | 3.964 | 61.65% | 453.10 | 4.270 | 11.97 | 15.51 | 0.00 | 15.51 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.20 | 1.0140 | 19.16% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.60 | 3.536 | 77.71% | 248.50 | 2.705 | 22.38 | 24.76 | 0.00 | 24.76 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.40 | 0.220 | 18.97% | 187.90 | 0.559 | 20.02 | 18.64 | 0.00 | 18.64 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.00 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | shut down | 5.83 | 5.55 | 0.00 | 5.55 | 0.00 |