Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2363.72ft | 844.986 | 57.90% | 2368.10ft | 907.189 | 8.31 | 52.22 | 0.00 | 52.22 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 156.01 | 656.240 | 64.48% | 155.19 | 636.754 | 1.76 | 34.23 | 0.00 | 34.23 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 974.88 | 342.180 | 76.63% | 972.62 | 312.560 | 11.42 | 25.54 | 0.00 | 25.54 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 768.60 | 119.950 | 59.68% | 768.50 | 118.750 | 0.00 | 10.76 | 0.00 | 10.76 | 0.00 | Tunnel Outflow -0.93MCM (10.76Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2652.00ft | 120.150 | 80.59% | 2662.00ft | 146.260 | 5.87 | 11.51 | 0.00 | 11.51 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1598.00 | 49.940 | 91.18% | 1597.90 | 49.690 | 0.23 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.17McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.03 | 49.8892 | 100.12% | 1207.03 | 49.889 | 0.55 | 0.00 | 0.05 | 0.05 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.15 | 40.7689 | 86.01% | 705.80 | 42.277 | 6.13 | 10.16 | 0.00 | 10.16 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.95 | 23.770 | 69.95% | 749.72 | 15.22 | 13.26 | 13.27 | 0.00 | 13.27 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 974.95 | 12.06 | 38.72% | 972.65 | 9.08 | 2.03 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.30 | 20.50 | 67.66% | 415.00 | 9.45 | 6.25 | 10.59 | 0.00 | 10.59 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1757.95 | 6.865 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.80 | 4.117 | 64.03% | 452.80 | 4.117 | 13.24 | 10.88 | 0.00 | 10.88 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.60 | 3.134 | 68.88% | 248.30 | 2.627 | 15.14 | 16.94 | 0.00 | 16.94 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.45 | 0.224 | 19.31% | 186.20 | 0.385 | 20.75 | 21.29 | 0.00 | 21.29 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.30 | 0.1955 | 25.62% | 820.00 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.165 | 42.31% | shut down | 4.80 | 4.93 | 0.00 | 4.93 | 0.00 |