Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2363.08ft | 835.889 | 57.27% | 2366.86ft | 889.569 | 4.14 | 11.85 | 0.00 | 11.85 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 155.49 | 643.882 | 63.26% | 154.74 | 626.062 | 3.43 | 19.03 | 0.00 | 19.03 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 974.44 | 336.240 | 75.30% | 972.42 | 309.960 | 7.04 | 14.91 | 0.00 | 14.91 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 768.15 | 115.150 | 57.29% | 768.15 | 115.150 | 3.36 | 10.30 | 0.00 | 10.30 | 0.00 | Tunnel Outflow -0.91MCM (10.53Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2650.60ft | 116.790 | 78.34% | 2662.40ft | 147.390 | 3.96 | 9.47 | 0.00 | 9.47 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1597.90 | 49.690 | 90.72% | 1597.75 | 49.415 | 1.97 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.17McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.01 | 49.7939 | 99.93% | 1207.03 | 49.889 | 0.51 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 704.80 | 39.9570 | 84.30% | 705.35 | 41.233 | 0.80 | 2.14 | 0.00 | 2.14 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 754.69 | 25.600 | 75.34% | 751.02 | 17.84 | 13.94 | 3.34 | 0.00 | 3.34 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 974.45 | 11.31 | 36.31% | 972.45 | 8.84 | 0.49 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.45 | 20.88 | 68.91% | 415.35 | 9.98 | 5.49 | 5.49 | 0.00 | 5.49 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1758.00 | 6.900 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.45 | 4.475 | 69.60% | 453.10 | 4.270 | 8.77 | 7.30 | 0.00 | 7.30 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 746.90 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 251.10 | 3.742 | 82.24% | 249.20 | 2.978 | 12.92 | 10.53 | 0.00 | 10.53 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.00 | 0.365 | 31.47% | 187.25 | 0.493 | 12.21 | 10.91 | 0.00 | 10.91 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.20 | 0.1917 | 25.12% | 819.90 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | shut down | 5.06 | 4.92 | 0.00 | 4.92 | 0.00 |