Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2362.10ft | 821.983 | 56.32% | 2364.26ft | 852.655 | 5.44 | 16.09 | 0.00 | 16.09 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 154.76 | 626.538 | 61.56% | 153.69 | 601.145 | 10.09 | 22.97 | 0.00 | 22.97 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 973.76 | 327.380 | 73.32% | 971.80 | 301.900 | 7.77 | 19.81 | 0.00 | 19.81 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 767.45 | 108.350 | 53.91% | 767.70 | 110.750 | 0.84 | 9.84 | 0.00 | 9.84 | 0.00 | Tunnel Outflow -0.85MCM (9.84Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2648.10ft | 110.870 | 74.36% | 2661.60ft | 145.130 | 2.84 | 11.00 | 0.00 | 11.00 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1597.45 | 48.565 | 88.67% | 1597.30 | 48.190 | 1.10 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.22McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1207.01 | 49.7939 | 99.93% | 1207.05 | 49.992 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 703.65 | 37.4352 | 78.98% | 704.35 | 37.833 | 5.58 | 10.18 | 0.00 | 10.18 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 755.20 | 26.900 | 79.16% | 749.93 | 15.65 | 11.90 | 12.78 | 0.00 | 12.78 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 973.85 | 10.55 | 33.87% | 971.80 | 8.06 | 1.34 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.10 | 20.00 | 66.01% | 414.80 | 9.15 | 7.49 | 7.49 | 0.00 | 7.49 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.30 | 7.120 | 93.07% | 1757.95 | 6.865 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.50 | 4.510 | 70.14% | 453.00 | 4.230 | 10.83 | 11.56 | 0.00 | 11.56 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 746.80 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 251.20 | 3.780 | 83.08% | 249.80 | 3.210 | 16.13 | 14.20 | 0.00 | 14.20 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.50 | 0.321 | 27.67% | 187.00 | 0.466 | 15.39 | 15.75 | 0.00 | 15.75 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 819.80 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.95 | 0.230 | 58.97% | shut down | 5.38 | 4.96 | 0.00 | 4.96 | 0.00 |