Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2358.26ft | 770.779 | 52.81% | 2358.68ft | 751.390 | 17.28 | 77.39 | 0.00 | 77.39 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 152.56 | 574.630 | 56.46% | 150.57 | 528.541 | 1.91 | 49.36 | 0.00 | 49.36 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 971.79 | 301.770 | 67.58% | 969.76 | 276.870 | 4.97 | 30.55 | 0.00 | 30.55 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 765.95 | 93.350 | 46.44% | 765.90 | 92.750 | 0.00 | 9.14 | 0.00 | 9.14 | 0.00 | Tunnel Outflow -0.79MCM (9.14Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2642.20ft | 97.810 | 65.61% | 2658.60ft | 136.840 | 1.95 | 11.78 | 0.00 | 11.78 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1596.50 | 46.190 | 84.33% | 1596.75 | 46.815 | 1.82 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.282McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1206.92 | 49.3996 | 99.14% | 1207.02 | 49.838 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 700.20 | 30.5756 | 64.51% | 701.85 | 33.856 | 3.27 | 10.17 | 0.00 | 10.17 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 755.48 | 27.580 | 81.17% | 750.08 | 15.95 | 11.94 | 11.94 | 0.00 | 11.94 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 971.95 | 8.24 | 26.45% | 969.80 | 5.98 | 3.17 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 417.45 | 14.00 | 46.20% | 413.60 | 7.35 | 11.17 | 18.11 | 0.00 | 18.11 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1758.10 | 6.970 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.15 | 4.296 | 66.81% | 451.30 | 3.352 | 13.85 | 12.97 | 0.00 | 12.97 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 746.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.20 | 3.372 | 74.11% | 249.20 | 2.978 | 13.32 | 16.16 | 0.00 | 16.16 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 187.80 | 0.549 | 47.33% | 186.50 | 0.415 | 27.03 | 25.93 | 0.00 | 25.93 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 819.70 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 847.00 | 0.236 | 60.51% | shut down | 4.99 | 4.44 | 0.00 | 4.44 | 0.00 |