Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2357.46ft | 760.963 | 52.14% | 2355.58ft | 737.872 | 11.03 | 62.46 | 0.00 | 62.46 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 152.23 | 566.987 | 55.71% | 150.15 | 518.814 | 1.99 | 43.97 | 0.00 | 43.97 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 971.35 | 296.230 | 66.34% | 969.47 | 273.390 | 12.80 | 43.13 | 0.00 | 43.13 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 765.80 | 91.750 | 45.65% | 765.65 | 90.350 | 2.08 | 9.03 | 0.00 | 9.03 | 0.00 | Tunnel Outflow -0.78MCM (9.03Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2641.50ft | 96.320 | 64.61% | 2658.20ft | 135.780 | 3.44 | 10.81 | 0.00 | 10.81 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1596.35 | 45.815 | 83.65% | 1596.65 | 46.565 | 2.49 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.34McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1206.91 | 49.3558 | 99.05% | 1207.02 | 49.838 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 700.00 | 30.1779 | 63.67% | 701.00 | 32.166 | 4.44 | 2.13 | 0.00 | 2.13 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 755.54 | 27.730 | 81.61% | 750.21 | 16.19 | 11.08 | 10.20 | 0.00 | 10.20 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 971.50 | 7.70 | 24.72% | 969.50 | 5.68 | 2.44 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.55 | 12.20 | 40.26% | 413.75 | 7.58 | 8.33 | 19.90 | 0.00 | 19.90 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1758.10 | 6.970 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.70 | 4.634 | 72.07% | 451.50 | 3.454 | 4.53 | 6.73 | 0.00 | 6.73 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 746.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.60 | 3.536 | 77.71% | 248.80 | 2.822 | 10.15 | 9.20 | 0.00 | 9.20 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.90 | 0.355 | 30.60% | 187.85 | 0.554 | 28.05 | 30.08 | 0.00 | 30.08 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 819.60 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.142 | 36.41% | shut down | 3.65 | 4.75 | 0.00 | 4.75 | 0.00 | ||||||
Grand Total | 3547.55 | 2002.10 | 56.44% | 1928.02 |