Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2354.76ft | 727.794 | 49.87% | 2351.76ft | 690.954 | 11.61 | 45.77 | 0.00 | 45.77 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 150.79 | 533.636 | 52.43% | 148.64 | 484.869 | 2.01 | 51.99 | 0.00 | 51.99 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 969.32 | 271.590 | 60.83% | 967.93 | 255.310 | 8.11 | 38.66 | 0.00 | 38.66 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 764.90 | 83.950 | 41.77% | 764.75 | 82.750 | 3.82 | 8.45 | 0.00 | 8.45 | 0.00 | Tunnel Outflow -0.73MCM (8.45Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2636.00ft | 85.090 | 57.07% | 2655.50ft | 128.800 | 3.93 | 19.76 | 0.00 | 19.76 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1595.40 | 43.440 | 79.31% | 1595.85 | 44.565 | 0.67 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.283McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1206.86 | 49.1367 | 98.61% | 1207.02 | 49.838 | 0.51 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 696.20 | 24.0205 | 50.68% | 697.25 | 25.717 | 3.04 | 12.49 | 0.00 | 12.49 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 755.93 | 28.720 | 84.52% | 751.33 | 18.450 | 10.58 | 10.58 | 0.00 | 10.58 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 969.45 | 5.63 | 18.07% | 968.00 | 4.180 | 2.51 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.85 | 10.80 | 35.64% | 413.80 | 7.650 | 15.72 | 14.43 | 0.00 | 14.43 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.15 | 7.005 | 91.57% | 1758.15 | 7.005 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.25 | 4.348 | 67.62% | 452.80 | 4.117 | 10.29 | 11.39 | 0.00 | 11.39 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 746.50 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 251.00 | 3.700 | 81.32% | 249.20 | 2.978 | 17.04 | 13.25 | 0.00 | 13.25 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.10 | 0.375 | 32.33% | 188.35 | 0.606 | 28.68 | 27.60 | 0.00 | 27.60 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.80 | 0.1743 | 22.84% | 819.60 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.85 | 0.201 | 51.54% | shut down | 4.57 | 4.44 | 0.00 | 4.44 | 0.00 |