Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | % Storage wrt Live Storage at FRL | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 | |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2352.44ft | 699.311 | 47.91% | 2349.22ft | 659.739 | 45.20% | 8.44 | 51.13 | 0.00 | 51.13 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 149.47 | 503.325 | 49.45% | 147.62 | 462.640 | 45.45% | 1.10 | 44.96 | 0.00 | 44.96 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 967.67 | 252.420 | 56.53% | 966.68 | 241.900 | 54.18% | 11.11 | 40.74 | 0.00 | 40.74 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 764.20 | 77.950 | 38.78% | 764.40 | 79.350 | 39.48% | 0.00 | 8.45 | 0.00 | 8.45 | 0.00 | Tunnel Outflow -0.73MCM (8.45 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2631.30ft | 76.350 | 51.21% | 2653.40ft | 123.570 | 82.88% | 3.86 | 12.25 | 0.00 | 12.25 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1594.60 | 41.440 | 75.66% | 1595.25 | 43.165 | 78.81% | 0.71 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.311McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1206.20 | 46.2453 | 92.81% | 1205.98 | 45.282 | 90.87% | 3.97 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 693.50 | 19.5064 | 41.15% | 697.90 | 26.755 | 56.44% | 11.56 | 13.50 | 0.00 | 13.50 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 755.17 | 26.820 | 78.93% | 751.00 | 17.780 | 52.32% | 9.94 | 13.47 | 0.00 | 13.47 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 967.75 | 3.93 | 12.62% | 966.75 | 2.930 | 9.41% | 1.25 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.80 | 10.77 | 35.54% | 413.85 | 7.730 | 25.51% | 10.02 | 15.00 | 0.00 | 15.00 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.15 | 7.005 | 91.57% | 1758.15 | 7.005 | 91.57% | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.20 | 4.321 | 67.20% | 451.65 | 3.530 | 54.90% | 11.87 | 9.80 | 0.00 | 9.80 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 746.50 | 0.00 | ||||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.20 | 3.372 | 74.11% | 249.50 | 3.095 | 68.02% | 13.37 | 13.37 | 0.00 | 13.37 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.70 | 0.336 | 28.97% | 184.80 | 0.254 | 21.90% | 27.14 | 28.44 | 0.00 | 28.44 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.70 | 0.1684 | 22.07% | 819.40 | |||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | shut down | 4.83 | 4.97 | 0.00 | 4.97 | 0.00 |