Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2349.60ft | 664.409 | 45.52% | 2345.28ft | 611.347 | 9.69 | 69.45 | 0.00 | 69.45 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 147.78 | 466.160 | 45.80% | 146.00 | 428.000 | 0.94 | 53.37 | 0.00 | 53.37 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 965.19 | 227.710 | 51.00% | 965.04 | 226.360 | 18.06 | 39.94 | 0.00 | 39.94 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 762.90 | 66.950 | 33.31% | 763.25 | 69.750 | 3.82 | 8.45 | 0.00 | 8.45 | 0.00 | Tunnel Outflow -0.73MCM (8.45 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2623.60ft | 62.820 | 42.14% | 2649.40ft | 76.420 | 4.80 | 16.46 | 0.00 | 16.46 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1593.15 | 37.815 | 69.04% | 1594.35 | 40.815 | 0.87 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.325McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1203.64 | 35.0300 | 70.30% | 1203.42 | 34.066 | 2.45 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.50 | 21.1783 | 44.68% | 699.90 | 29.979 | 5.34 | 9.21 | 0.00 | 9.21 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.83 | 23.470 | 69.07% | 751.67 | 19.120 | 9.09 | 16.20 | 0.00 | 16.20 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.35 | 1.69 | 5.43% | 965.15 | 1.530 | 1.20 | 0.00 | 0.00 | 0.00 | 1.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.20 | 11.50 | 37.95% | 413.80 | 7.650 | 12.15 | 15.62 | 0.00 | 15.62 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.10 | 6.970 | 91.11% | 1758.20 | 7.045 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.40 | 4.443 | 69.10% | 452.15 | 3.785 | 9.85 | 11.32 | 0.00 | 11.32 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.60 | 0.8110 | 15.33% | 746.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.10 | 3.331 | 73.21% | 249.50 | 3.095 | 15.46 | 15.46 | 0.00 | 15.46 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 189.40 | 0.727 | 62.67% | 185.40 | 0.315 | 26.91 | 26.91 | 0.00 | 26.91 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.60 | 0.1624 | 21.28% | 819.40 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | shut down | 4.53 | 4.66 | 0.00 | 4.66 | 0.00 |