Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2344.56ft | 602.498 | 41.28% | 2341.08ft | 559.759 | 3.21 | 43.54 | 0.00 | 43.54 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 145.36 | 414.560 | 40.73% | 144.48 | 396.392 | 2.52 | 45.47 | 0.00 | 45.47 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 961.71 | 197.140 | 44.15% | 962.92 | 207.420 | 5.17 | 27.74 | 0.00 | 27.74 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 761.60 | 56.350 | 28.03% | 762.10 | 60.150 | 0.00 | 9.03 | 0.00 | 9.03 | 0.00 | Tunnel Outflow -0.78MCM (9.03 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2614.70ft | 49.070 | 32.91% | 2645.70ft | 105.390 | 1.74 | 11.86 | 0.00 | 11.86 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1591.55 | 34.440 | 62.88% | 1593.60 | 38.940 | 0.20 | 3.33 | 0.00 | 3.33 | 0.00 | Sluice discharge/day – 0.0175McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1201.06 | 26.2876 | 52.75% | 1200.82 | 25.523 | 3.47 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 692.80 | 18.3938 | 38.81% | 699.60 | 29.469 | 12.05 | 8.40 | 0.00 | 8.40 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.45 | 18.700 | 55.03% | 751.88 | 19.550 | 13.77 | 12.34 | 0.00 | 12.34 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.30 | 0.10 | 0.32% | 963.45 | 0.210 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.50 | 10.20 | 33.66% | 414.15 | 8.180 | 8.98 | 12.68 | 0.00 | 12.68 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.10 | 6.970 | 91.11% | 1758.15 | 7.005 | 1.16 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.80 | 4.697 | 73.05% | 451.60 | 3.505 | 5.48 | 6.58 | 0.00 | 6.58 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.40 | 0.7703 | 14.56% | 746.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.40 | 3.454 | 75.91% | 249.40 | 3.056 | 9.02 | 11.39 | 0.00 | 11.39 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.90 | 0.456 | 39.31% | 188.20 | 0.590 | 20.56 | 22.43 | 0.00 | 22.43 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.50 | 0.1565 | 20.51% | 819.40 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.95 | 0.225 | 57.69% | shut down | 4.18 | 3.77 | 0.00 | 3.77 | 0.00 |