Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2342.32ft | 574.989 | 39.40% | 2336.66ft | 512.937 | 3.88 | 55.47 | 0.00 | 55.47 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 144.16 | 389.864 | 38.30% | 142.96 | 366.476 | 3.17 | 42.47 | 0.00 | 42.47 | 6.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 959.84 | 181.240 | 40.59% | 960.67 | 188.300 | 5.01 | 38.46 | 0.00 | 38.46 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 760.90 | 51.150 | 25.45% | 761.30 | 54.350 | 0.00 | 8.91 | 0.00 | 8.91 | 0.00 | Tunnel Outflow -0.77MCM (8.91 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2610.50ft | 43.230 | 29.00% | 2643.40ft | 100.370 | 4.08 | 13.35 | 0.00 | 13.35 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.75 | 32.840 | 59.96% | 1592.95 | 37.290 | 2.15 | 0.00 | 0.00 | 0.00 | 1.00 | Sluice discharge/day – 0.386McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1199.53 | 21.4153 | 42.98% | 1199.16 | 20.237 | 2.36 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 693.80 | 20.0080 | 42.21% | 697.90 | 26.755 | 9.10 | 11.03 | 0.00 | 11.03 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.99 | 17.780 | 52.32% | 748.25 | 12.540 | 10.97 | 13.78 | 0.00 | 13.78 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 962.80 | 0.00 | 0.00% | 962.95 | 0.000 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.30 | 9.95 | 32.84% | 413.90 | 7.800 | 11.84 | 11.84 | 0.00 | 11.84 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.05 | 6.935 | 90.65% | 1758.15 | 7.005 | 1.16 | 0.00 | 1.16 | 1.16 | 8.20 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.80 | 4.697 | 73.05% | 450.30 | 2.841 | 7.79 | 9.63 | 0.00 | 9.63 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.30 | 0.7500 | 14.17% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.90 | 3.659 | 80.42% | 247.70 | 2.417 | 11.71 | 11.24 | 0.00 | 11.24 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.20 | 0.590 | 50.86% | 187.65 | 0.534 | 27.89 | 29.29 | 0.00 | 29.29 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.50 | 0.1565 | 20.51% | 819.40 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | shut down | 3.83 | 3.96 | 0.00 | 3.96 | 0.00 |