Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2337.94ft | 524.493 | 35.94% | 2332.24ft | 463.595 | 13.60 | 73.06 | 0.00 | 73.06 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 142.23 | 352.350 | 34.62% | 140.82 | 325.031 | 2.83 | 49.19 | 0.00 | 49.19 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 956.18 | 151.700 | 33.97% | 957.02 | 158.060 | 7.57 | 41.48 | 0.00 | 41.48 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 759.55 | 41.950 | 20.87% | 759.70 | 42.750 | 4.63 | 9.26 | 0.00 | 9.26 | 0.00 | Tunnel Outflow -0.80MCM (9.26 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2602.30ft | 32.880 | 22.05% | 2641.80ft | 96.960 | 3.53 | 17.95 | 0.00 | 17.95 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1589.20 | 32.840 | 59.96% | 1590.75 | 32.840 | 0.22 | 3.70 | 0.00 | 3.70 | 0.00 | Sluice discharge/day – 0.00McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.49 | 12.6191 | 25.32% | 1196.36 | 12.394 | 5.95 | 0.00 | 0.00 | 0.00 | 10.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 692.50 | 17.9201 | 37.81% | 694.95 | 21.931 | 7.96 | 13.44 | 0.00 | 13.44 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.74 | 13.380 | 39.38% | 747.92 | 11.990 | 7.71 | 16.48 | 0.00 | 16.48 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 962.75 | 0.00 | 0.00% | 962.55 | 0.000 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 413.80 | 7.65 | 25.25% | 413.80 | 7.650 | 13.65 | 13.65 | 0.00 | 13.65 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.05 | 6.935 | 90.65% | 1758.30 | 7.120 | 0.75 | 0.00 | 1.16 | 1.16 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 454.40 | 5.080 | 79.00% | 452.50 | 3.960 | 12.34 | 4.55 | 0.00 | 4.55 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.10 | 0.7094 | 13.41% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.90 | 3.250 | 71.43% | 249.80 | 3.210 | 12.56 | 15.86 | 0.00 | 15.86 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.40 | 0.611 | 52.67% | 188.30 | 0.601 | 27.96 | 27.36 | 0.00 | 27.36 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.00 | 0.1269 | 16.63% | 819.40 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.140 | 35.90% | shut down | 4.52 | 4.93 | 0.00 | 4.93 | 0.00 |