Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2334.38ft | 486.462 | 33.33% | 2326.9ft | 406.553 | 10.66 | 38.51 | 0.00 | 38.51 | 2.80 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 140.52 | 319.166 | 31.36% | 139.51 | 299.69 | 8.66 | 26.35 | 0.00 | 26.35 | 30.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 952.22 | 124.230 | 27.82% | 952.53 | 126.25 | 7.63 | 21.98 | 0.00 | 21.98 | 16.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 757.90 | 31.350 | 15.60% | 758.00 | 31.85 | 3.01 | 8.80 | 0.00 | 8.80 | 12.00 | Tunnel Outflow -0.760MCM (8.80Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2593.80ft | 23.140 | 15.52% | 2643.30ft | 100.15 | 4.21 | 10.04 | 0.00 | 10.04 | 14.20 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.25 | 31.840 | 58.13% | 1583.00 | 18.79 | 5.91 | 2.23 | 0.00 | 2.23 | 10.00 | Sluice discharge/day – 0.00McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1191.90 | 4.6585 | 9.35% | 1192.84 | 6.2887 | 3.55 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 693.65 | 19.7572 | 41.68% | 695.60 | 23.0174 | 6.46 | 4.53 | 0.00 | 4.53 | 10.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.13 | 12.350 | 36.34% | 747.61 | 11.46 | 11.28 | 10.72 | 0.00 | 10.72 | 9.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.05 | 0.00 | 0.00% | 963.70 | 0.38 | 0.00 | 0.00 | 0.00 | 0.00 | 7.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 413.65 | 7.43 | 24.50% | 413.90 | 7.80 | 7.52 | 11.86 | 0.00 | 11.86 | 48.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1746.20 | 1.316 | 17.20% | 1758.10 | 6.97 | 0.00 | 0.00 | 0.00 | 0.00 | 31.40 | Sluice discharge/day – 0 .422McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.70 | 4.634 | 72.07% | 452.75 | 4.091 | 5.63 | 4.90 | 0.00 | 4.90 | 19.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.00 | 0.6890 | 13.02% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.60 | 3.536 | 77.71% | 248.50 | 2.705 | 11.50 | 9.60 | 0.00 | 9.60 | 2.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.75 | 0.250 | 21.55% | 186.40 | 0.405 | 8.23 | 16.79 | 0.00 | 16.79 | 68.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.10 | 0.1328 | 17.40% | 819.00 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | shut down | 4.25 | 4.52 | 0.00 | 4.52 | 0.00 |