Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2333.86ft | 480.911 | 32.95% | 2324.96ft | 385.843 | 19.02 | 44.41 | 0.00 | 44.41 | 0.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 140.29 | 314.669 | 30.92% | 138.78 | 285.93 | 6.30 | 19.34 | 0.00 | 19.34 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 951.50 | 119.800 | 26.83% | 951.24 | 118.24 | 7.37 | 23.34 | 0.00 | 23.34 | 7.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 757.50 | 29.150 | 14.50% | 757.60 | 29.75 | 1.74 | 8.68 | 0.00 | 8.68 | 0.00 | Tunnel Outflow -0.750MCM (8.68Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2591.00ft | 20.450 | 13.72% | 2642.90ft | 99.29 | 4.30 | 15.12 | 0.00 | 15.12 | 3.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.55 | 32.440 | 59.23% | 1582.80 | 18.49 | 3.11 | 1.95 | 0.00 | 1.95 | 0.00 | Sluice discharge/day – 0.00McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1190.80 | 3.0077 | 6.04% | 1191.6 | 4.1382 | 5.52 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.20 | 20.6768 | 43.62% | 695.00 | 22.0143 | 11.44 | 8.53 | 0.00 | 8.53 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.13 | 12.350 | 36.34% | 747.16 | 10.69 | 10.21 | 13.22 | 0.00 | 13.22 | 6.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.00 | 0.00 | 0.00% | 963.55 | 0.28 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 414.00 | 9.65 | 31.85% | 414.30 | 8.40 | 17.26 | 19.00 | 0.00 | 19.00 | 0.40 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1741.00 | 0.090 | 1.18% | 1758.05 | 6.935 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 .380McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.60 | 4.015 | 62.44% | 450.85 | 3.122 | 10.60 | 10.89 | 0.00 | 10.89 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.00 | 0.6890 | 13.02% | 746.30 | 0.00 | Details as on 15.04.24 | ||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.00 | 2.900 | 63.74% | 248.00 | 2.51 | 10.66 | 12.47 | 0.00 | 12.47 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.55 | 0.232 | 20.00% | 188.30 | 0.601 | 17.97 | 18.09 | 0.00 | 18.09 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 819.80 | 0.1743 | 22.84% | 819.10 | Details as on 15.04.24 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.165 | 42.31% | shut down | 4.28 | 4.28 | 0.00 | 4.28 | 0.00 |