Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2334.00ft | 482.405 | 33.05% | 2322.40ft | 358.497 | 58.90 | 32.40 | 0.00 | 32.40 | 61.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 140.18 | 312.519 | 30.71% | 137.99 | 271.32 | 8.41 | 16.91 | 0.00 | 16.91 | 35.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 951.54 | 120.040 | 26.88% | 949.63 | 108.93 | 23.76 | 12.65 | 0.00 | 12.65 | 46.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 757.15 | 27.150 | 13.51% | 757.30 | 28.15 | 0.00 | 8.22 | 0.00 | 8.22 | 28.00 | Tunnel Outflow -0.710MCM (8.22Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2588.20ft | 17.930 | 12.03% | 2642.40ft | 98.23 | 4.64 | 12.77 | 0.00 | 12.77 | 10.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.60 | 32.540 | 59.41% | 1583.00 | 18.79 | 1.93 | 1.85 | 0.00 | 1.85 | 2.00 | Sluice discharge/day – 0.00McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1189.50 | 2.3438 | 4.70% | 1189.00 | 2.0885 | 9.21 | 0.00 | 0.00 | 0.00 | 14.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.75 | 21.5963 | 45.56% | 693.40 | 19.3411 | 8.22 | 5.31 | 0.00 | 5.31 | 34.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.62 | 13.170 | 38.76% | 746.52 | 9.66 | 13.39 | 6.08 | 0.00 | 6.08 | 12.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 963.90 | 0.53 | 1.70% | 963.55 | 0.28 | 6.93 | 0.00 | 0.00 | 0.00 | 34.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.55 | 10.36 | 34.19% | 413.90 | 7.80 | 19.45 | 3.70 | 0.00 | 3.70 | 14.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1741.00 | 0.090 | 1.18% | 1758.00 | 6.90 | 0.00 | 0.00 | 0.00 | 0.00 | 15.40 | Sluice discharge/day – 0 | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.60 | 4.015 | 62.44% | 452.30 | 3.862 | 5.56 | 7.33 | 0.00 | 7.33 | 45.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.10 | 0.7094 | 13.41% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.90 | 2.861 | 62.88% | 249.50 | 3.095 | 28.20 | 26.85 | 0.00 | 26.85 | 40.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 184.85 | 0.258 | 22.24% | 187.70 | 0.539 | 12.46 | 13.61 | 0.00 | 13.61 | 22.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.00 | 0.1842 | 24.14% | 819.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.90 | 0.213 | 54.62% | shut down | 5.13 | 4.72 | 0.00 | 4.72 | 9.60 |