Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2403.00 ft | 2395.00 | 2401.00 | 2402.00 | 2333.32ft | 475.146 | 32.56% | 2317.04ft | 305.903 | 44.58 | 99.63 | 0.00 | 99.63 | 0.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 169.00 | 167.50 | 168.00 | 168.50 | 139.52 | 299.880 | 29.46% | 136.32 | 240.76 | 9.59 | 51.19 | 0.00 | 51.19 | 4.60 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 981.46 | 979.46 | 980.46 | 980.96 | 951.58 | 120.280 | 26.94% | 945.96 | 89.81 | 18.57 | 46.35 | 0.00 | 46.35 | 8.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.60 | 774.10 | 774.60 | 775.10 | 756.50 | 23.550 | 11.72% | 756.40 | 23.15 | 0.00 | 7.87 | 0.00 | 7.87 | 0.00 | Tunnel Outflow -0.68MCM (7.87 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2590.10ft | 19.630 | 13.17% | 2640.50ft | 94.2 | 1.05 | 0.00 | 0.00 | 0.00 | 10.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1590.85 | 33.040 | 60.32% | 1583.55 | 19.615 | 0.00 | 2.01 | 0.00 | 2.01 | 0.00 | Sluice discharge/day – 0.00McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1189.80 | 2.4970 | 5.01% | 1188.00 | 1.58 | 11.57 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 696.70 | 24.8391 | 52.40% | 689.10 | 12.79 | 3.95 | 5.80 | 0.00 | 5.80 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 748.65 | 13.220 | 38.91% | 745.42 | 23.59 | 10.36 | 11.57 | 0.00 | 11.57 | 0.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.50 | 1.01 | 3.24% | 963.65 | 0.34 | 13.65 | 0.00 | 0.00 | 0.00 | 3.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 414.90 | 9.30 | 30.69% | 413.95 | 7.88 | 5.28 | 16.56 | 0.00 | 16.56 | 12.20 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1741.00 | 0.090 | 1.18% | 1758.10 | 6.97 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.30 | 4.380 | 68.12% | 452.10 | 3.76 | 11.95 | 14.88 | 0.00 | 14.88 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.70 | 0.8313 | 15.71% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.00 | 2.510 | 55.16% | 247.20 | 2.262 | 35.50 | 32.63 | 0.00 | 32.63 | 1.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.40 | 0.611 | 52.67% | 186.40 | 0.405 | 33.35 | 33.05 | 0.00 | 33.05 | 6.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.30 | 0.1955 | 25.62% | 819.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.50 | 0.118 | 30.26% | shut down | shut down | 4.98 | 6.90 | 0.00 | 6.90 | 0.70 |