Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage w.r.t Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 17 | 18 | 19 | 20 | 21 | 22=20+21 | 23 | 24 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2373.00 ft | 2365.00 | 2371.00 | 2372.00 | 2329.64ft | 435.832 | 29.86% | 2310.64 | 247.615 | 33.76 | 94.05 | 0.00 | 94.05 | 4.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.00 | 159.50 | 160.00 | 160.50 | 138.32 | 277.420 | 27.26% | 134.21 | 208.150 | 15.15 | 58.91 | 0.00 | 58.91 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 948.58 | 103.130 | 23.10% | 940.52 | 66.530 | 17.34 | 45.58 | 0.00 | 45.58 | 12.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 767.00 | 765.50 | 766.00 | 766.50 | 755.45 | 18.050 | 8.98% | 755.20 | 16.750 | 0.35 | 8.45 | 0.00 | 8.45 | 0.00 | Tunnel Outflow -0.73MCM (8.45 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2583.50ft | 13.900 | 9.32% | 2637.10ft | 87.250 | 6.49 | 18.95 | 0.00 | 18.95 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1591.00 | 33.340 | 60.87% | 1583.75 | 19.915 | 2.60 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.243McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1189.80 | 2.4970 | 5.01% | 1191.00 | 3.1098 | 11.57 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 1.0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 691.75 | 16.7359 | 35.31% | 685.75 | 8.7504 | 4.82 | 16.70 | 0.00 | 16.70 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 746.40 | 9.480 | 27.90% | 747.00 | 10.440 | 13.34 | 19.99 | 0.00 | 19.99 | 24.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.10 | 0.69 | 2.22% | 963.55 | 0.28 | 9.41 | 0.00 | 0.00 | 0.00 | 4.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.20 | 11.50 | 37.95% | 414.30 | 8.40 | 25.72 | 20.13 | 0.00 | 20.13 | 0.00 | Vachumaram- Nil | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1741.00 | 0.090 | 1.18% | 1757.85 | 6.795 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.20 | 3.811 | 59.27% | 451.05 | 3.224 | 18.34 | 19.22 | 0.00 | 19.22 | 11.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.80 | 0.8590 | 16.23% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 247.60 | 2.386 | 52.44% | 248.90 | 2.861 | 26.78 | 26.42 | 0.00 | 26.42 | 22.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.95 | 0.676 | 58.28% | 186.60 | 0.425 | 32.93 | 33.77 | 0.00 | 33.77 | 4.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.20 | 0.1917 | 25.12% | 819.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.154 | 39.49% | 845.50 | Tunnel filling | 5.13 | 4.71 | 0.00 | 4.71 | 0.00 |