Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage w.r.t Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 17 | 18 | 19 | 20 | 21 | 22=20+21 | 23 | 24 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2375.33 ft | 2367.33 | 2373.33 | 2374.33 | 2339.60 | 542.216 | 37.15% | 2306.28ft | 207.907 | 138.03 | 55.11 | 0.00 | 55.11 | 7.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.50 | 160.00 | 160.50 | 161.00 | 140.91 | 326.790 | 32.11% | 133.16 | 192.82 | 113.62 | 18.52 | 0.00 | 18.52 | 8.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 955.05 | 143.250 | 32.08% | 936.04 | 50.040 | 81.64 | 24.11 | 0.00 | 24.11 | 11.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 771.00 | 769.50 | 770.00 | 770.50 | 760.35 | 47.350 | 23.56% | 755.20 | 16.750 | 48.61 | 0.00 | 0.00 | 0.00 | 64.40 | Tunnel Outflow -0.00MCM (0.00 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2591.10ft | 20.540 | 13.78% | 2622.90ft | 61.650 | 12.20 | 9.02 | 0.00 | 9.02 | 32.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1592.30 | 35.940 | 65.62% | 1583.60 | 19.690 | 4.63 | 0.00 | 0.00 | 0.00 | 14.00 | Sluice discharge/day -0 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1191.43 | 3.8433 | 7.71% | 1193.30 | 7.0865 | 2.81 | 0.00 | 0.00 | 0.00 | 6.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 696.30 | 24.1877 | 51.03% | 685.35 | 8.3537 | 9.21 | 4.37 | 0.00 | 4.37 | 2.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.64 | 21.070 | 62.01% | 749.44 | 14.670 | 27.41 | 23.15 | 0.00 | 23.15 | 86.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 968.20 | 4.38 | 14.06% | 964.35 | 0.89 | 31.50 | 0.00 | 0.00 | 0.00 | 8.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.75 | 26.63 | 87.89% | 414.55 | 8.78 | 84.25 | 55.76 | 16.45 | 72.21 | 42.00 | Vachumaram- 1.1605 Mcm Gate No. 3 opened 7feet and now 0.85m | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1741.00 | 0.090 | 1.18% | 1748.85 | 2.220 | 0.00 | 0.00 | 0.00 | 0.00 | 8.00 | Sluice discharge/day – 0 | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 455.35 | 5.680 | 88.34% | 451.65 | 3.530 | 53.14 | 44.56 | 0.00 | 44.56 | 21.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 746.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 247.60 | 2.386 | 52.44% | 248.90 | 2.861 | 85.08 | 91.48 | 0.00 | 91.48 | 14.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 189.10 | 0.693 | 59.74% | 185.10 | 0.283 | 24.86 | 23.78 | 0.00 | 23.78 | 14.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 819.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 846.65 | 0.154 | 3.97 | 3.97 | 0.00 | 3.97 | 9.00 |