Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage w.r.t Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 17 | 18 | 19 | 20 | 21 | 22=20+21 | 23 | 24 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2375.33 ft | 2367.33 | 2373.33 | 2374.33 | 2340.76ft | 555.826 | 38.08% | 2319.90 | 331.952 | 59.98 | 67.14 | 0.00 | 67.14 | 2.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.50 | 160.00 | 160.50 | 161.00 | 142.15 | 350.803 | 34.47% | 138.69 | 284.27 | 62.82 | 33.61 | 0.00 | 33.61 | 12.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 955.42 | 146.000 | 32.70% | 951.14 | 117.640 | 33.20 | 41.07 | 0.00 | 41.07 | 10.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 771.00 | 769.50 | 770.00 | 770.50 | 763.00 | 67.350 | 33.51% | 759.80 | 43.350 | 25.46 | 0.00 | 0.00 | 0.00 | 22.80 | Tunnel Outflow -0.00MCM (0.00 Cumecs) |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2600.30ft | 30.370 | 20.37% | 2625.60ft | 66.220 | 21.93 | 3.74 | 0.00 | 3.74 | 35.40 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1592.85 | 37.040 | 67.63% | 1585.00 | 21.790 | 1.16 | 0.00 | 0.00 | 0.00 | 9.00 | Sluice discharge/day -0 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1191.96 | 4.7625 | 9.56% | 1194.89 | 9.8441 | 1.20 | 0.00 | 0.00 | 0.00 | 3.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 693.00 | 18.7095 | 39.47% | 694.80 | 21.6799 | 7.36 | 14.67 | 0.00 | 14.67 | 6.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.11 | 16.010 | 47.12% | 753.80 | 23.290 | 14.90 | 29.05 | 0.00 | 29.05 | 45.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.15 | 1.53 | 4.91% | 970.70 | 6.88 | 21.40 | 0.00 | 0.00 | 0.00 | 3.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.70 | 21.50 | 70.96% | 423.35 | 28.32 | 57.48 | 54.59 | 0.00 | 54.59 | 36.30 | Vachumaram- 0.00 Mcm. | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1742.30 | 0.320 | 4.18% | 1750.70 | 2.960 | 0.69 | 0.00 | 0.00 | 0.00 | 2.20 | Sluice discharge/day – 0 | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.65 | 4.040 | 62.83% | 456.10 | 6.156 | 35.45 | 35.74 | 0.00 | 35.74 | 7.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 747.40 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 247.40 | 2.324 | 51.08% | 253.00 | 4.550 | 64.95 | 68.00 | 0.00 | 68.00 | 7.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 188.70 | 0.646 | 55.69% | 186.35 | 0.400 | 32.83 | 30.73 | 0.00 | 30.73 | 7.00 | Gate No 2 closed at 3 p.m..on 05.07.24 | |||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.10 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.142 | 36.41% | 846.60 | 0.142 | 6.34 | 6.34 | 0.00 | 6.34 | 2.20 |