Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage w.r.t Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 17 | 18 | 19 | 20 | 21 | 22=20+21 | 23 | 24 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2392.55 ft | 2384.55 | 2390.55 | 2391.55 | 2372.88ft | 975.058 | 66.81% | 2329.18ft | 430.921 | 96.46 | 45.69 | 0.00 | 45.69 | 9.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 165.00 | 163.50 | 164.00 | 164.50 | 159.44 | 744.320 | 73.13% | 145.82 | 424.22 | 64.11 | 18.31 | 0.00 | 18.31 | 8.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 976.40 | 974.40 | 975.40 | 975.90 | 969.04 | 268.230 | 60.07% | 959.65 | 179.630 | 42.37 | 21.53 | 0.00 | 21.53 | 5.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 775.00 | 773.50 | 774.00 | 774.50 | 774.50 | 187.550 | 93.31% | 768.55 | 119.150 | 11.92 | 11.92 | 0.00 | 11.92 | 8.20 | Tunnel Outflow -1.03MCM (11.92 Cumecs) Control shaft opened 4.9.24 11.40 am |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2660.00 | 2661.00 | 2662.00ft | 146.260 | 98.10% | 2651.20ft | 118.230 | 12.22 | 22.05 | 0.00 | 22.05 | 1.20 | Gate Closed | |
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1598.00 | 49.940 | 91.18% | 1589.50 | 30.340 | 10.03 | 6.23 | 5.54 | 11.76 | 0.00 | Gate No.2 opening-10cm | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1202.90 | 32.1417 | 64.50% | 1197.68 | 15.5240 | 1.11 | 0.00 | 0.00 | 0.00 | 0.00 | ||
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 705.45 | 41.4648 | 87.48% | 691.50 | 16.3411 | 26.79 | 20.27 | 7.86 | 28.13 | 0.00 | Gate # 2 -10cm | |
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 756.70 | 30.629 | 90.14% | 748.29 | 12.610 | 29.35 | 29.35 | 0.00 | 29.35 | 39.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 970.05 | 6.23 | 20.00% | 966.30 | 2.48 | 15.08 | 0.00 | 0.00 | 0.00 | 25.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 422.60 | 26.25 | 86.63% | 414.15 | 8.17 | 87.79 | 43.40 | 14.74 | 58.14 | 8.20 | Vachumaram- 0.0617 Mm3 Crest Gate No. 1,2,3,4,5&6 opened for 3ft with no flow depth | |
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1758.25 | 7.080 | 92.55% | 1757.10 | 6.270 | 0.68 | 0.00 | 0.68 | 0.68 | 0.00 | Gate No. 2 & 4 – 10 cm | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 456.25 | 6.251 | 97.22% | 452.60 | 4.015 | 45.07 | 37.44 | 7.27 | 44.70 | 2.00 | Gate # 3-5cm | |||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 746.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.30 | 2.627 | 57.74% | 248.60 | 2.744 | 79.87 | 93.27 | 0.00 | 93.27 | 4.00 | Gate operation – Nil | |||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 187.25 | 0.493 | 42.50% | 187.45 | 0.513 | 21.83 | 22.06 | 0.00 | 22.06 | 3.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.50 | 0.2030 | 26.61% | 819.90 | ||||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.45 | 0.106 | 27.18% | 846.75 | 0.177 | 3.91 | 4.46 | 0.00 | 4.46 | 0.00 |