Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2377.95 ft | 2369.95 | 2375.95 | 2376.95 | 2322.28ft | 357.212 | 24.48% | 2359.86ft | 790.442 | 67.78 | 31.73 | 0.00 | 31.73 | 6.20 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.75 | 160.25 | 160.75 | 161.25 | 139.77 | 304.630 | 29.93% | 150.29 | 522.056 | 46.39 | 8.42 | 0.00 | 8.42 | 1.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 953.31 | 131.320 | 29.41% | 962.91 | 207.340 | 35.38 | 25.54 | 0.00 | 25.54 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 760.50 | 48.350 | 24.05% | 767.70 | 110.750 | 11.57 | 0.00 | 0.00 | 0.00 | 24.60 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2626.80ft | 68.320 | 45.82% | 2616.50 | 51.720 | 4.80 | 2.74 | 0.00 | 2.74 | 5.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1585.45 | 22.465 | 41.02% | 1586.30 | 23.940 | 1.74 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1195.28 | 10.5205 | 21.11% | 1195.86 | 11.526 | 1.61 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 696.40 | 24.3549 | 51.38% | 704.05 | 38.2305 | 10.59 | 7.69 | 0.00 | 7.69 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.81 | 17.420 | 51.27% | 757.46 | 32.53 | 7.19 | 24.81 | 0.00 | 24.81 | 11.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.45 | 1.77 | 5.68% | 969.95 | 6.13 | 28.10 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.20 | 20.25 | 66.83% | 420.50 | 21.000 | 24.85 | 55.23 | 0.00 | 55.23 | 1.20 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1751.55 | 3.300 | 43.14% | 1750.50 | 2.880 | 0.69 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 453.50 | 4.507 | 70.09% | 456.40 | 6.332 | 26.92 | 13.84 | 0.00 | 13.84 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 748.50 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.70 | 2.783 | 61.16% | 253.00 | 4.550 | 37.43 | 37.43 | 0.00 | 37.43 | 1.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.20 | 0.385 | 33.19% | 187.50 | 0.518 | 23.69 | 22.72 | 0.00 | 22.72 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 820.60 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.170 | 43.59% | 846.80 | 0.189 | 9.37 | 9.23 | 0.00 | 9.23 | 0.00 |