Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2377.95 ft | 2369.95 | 2375.95 | 2376.95 | 2322.54t | 359.995 | 24.67% | 2361.64ft | 815.447 | 62.91 | 29.33 | 0.00 | 29.33 | 18.80 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 161.75 | 160.25 | 160.75 | 161.25 | 139.93 | 307.670 | 30.23% | 151.28 | 544.985 | 42.48 | 6.82 | 0.00 | 6.82 | 6.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 953.41 | 131.970 | 29.56% | 964.37 | 220.330 | 29.91 | 22.38 | 0.00 | 22.38 | 14.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 760.60 | 48.950 | 24.35% | 768.60 | 119.950 | 6.94 | 0.00 | 0.00 | 0.00 | 11.60 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2626.80ft | 68.320 | 45.82% | 2621.20 | 58.880 | 8.52 | 8.52 | 0.00 | 8.52 | 10.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1585.50 | 22.540 | 41.15% | 1586.30 | 23.940 | 0.87 | 0.00 | 0.00 | 0.00 | 3.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1195.37 | 10.6766 | 21.43% | 1196.25 | 12.203 | 1.81 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 696.55 | 24.5996 | 51.90% | 705.30 | 41.1168 | 6.67 | 3.84 | 0.00 | 3.84 | 14.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 750.11 | 16.013 | 47.12% | 757.85 | 33.53 | 7.21 | 23.50 | 0.00 | 23.50 | 51.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.10 | 1.49 | 4.78% | 972.25 | 8.60 | 22.47 | 0.00 | 0.00 | 0.00 | 2.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 419.20 | 17.75 | 58.58% | 421.40 | 23.250 | 25.78 | 54.71 | 0.00 | 54.71 | 11.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1751.45 | 3.260 | 42.61% | 1751.20 | 3.160 | 0.69 | 0.00 | 0.00 | 0.00 | 0.40 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.40 | 3.913 | 60.86% | 456.10 | 6.156 | 20.64 | 24.18 | 0.00 | 24.18 | 1.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 748.80 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.50 | 3.095 | 68.02% | 253.00 | 4.550 | 46.90 | 43.29 | 0.00 | 43.29 | 30.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.40 | 0.315 | 27.16% | 190.85 | 0.919 | 19.49 | 22.07 | 0.00 | 22.07 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.10 | 0.1880 | 24.64% | 821.00 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.65 | 0.150 | 38.46% | 847.00 | 0.236 | 9.19 | 9.33 | 0.00 | 9.33 | 19.00 |