Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2380.58 ft | 2372.58 | 2378.58 | 2379.58 | 2324.36ft | 379.437 | 26.00% | 2370.72ft | 944.386 | 63.45 | 27.48 | 0.00 | 27.48 | 1.80 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 162.50 | 161.00 | 161.50 | 162.00 | 140.99 | 328.354 | 32.26% | 155.89 | 653.386 | 36.86 | 18.31 | 0.00 | 18.31 | 6.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 953.70 | 133.850 | 29.98% | 969.42 | 272.790 | 30.62 | 26.10 | 0.00 | 26.10 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 762.50 | 63.350 | 31.52% | 772.15 | 159.350 | 39.35 | 0.00 | 0.00 | 0.00 | 97.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2626.60ft | 67.960 | 45.58% | 2648.70 | 112.280 | 8.49 | 4.55 | 0.00 | 4.55 | 13.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1586.05 | 23.440 | 42.80% | 1591.10 | 33.540 | 2.31 | 0.00 | 0.00 | 0.00 | 0.60 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1195.85 | 11.5091 | 23.10% | 1198.45 | 17.976 | 1.41 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.50 | 21.1783 | 44.68% | 706.50 | 43.9000 | 10.62 | 20.30 | 0.00 | 20.30 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 746.43 | 9.525 | 28.03% | 757.06 | 31.54 | 20.74 | 15.98 | 0.00 | 15.98 | 65.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.50 | 1.81 | 5.81% | 972.65 | 9.08 | 28.91 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 415.75 | 10.61 | 35.02% | 421.55 | 23.630 | 25.18 | 24.23 | 0.00 | 24.23 | 9.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1752.30 | 3.650 | 47.71% | 1754.75 | 4.875 | 0.58 | 0.00 | 0.00 | 0.00 | 0.60 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.45 | 3.428 | 53.31% | 456.30 | 6.281 | 29.71 | 37.39 | 0.00 | 37.39 | 1.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 747.30 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.90 | 3.251 | 71.45% | 252.90 | 4.507 | 70.84 | 69.48 | 0.00 | 69.48 | 1.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.40 | 0.315 | 27.16% | 190.00 | 0.797 | 22.69 | 23.17 | 0.00 | 23.17 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.20 | 0.1917 | 25.12% | 820.50 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.70 | 0.170 | 43.59% | 847.00 | 0.236 | 8.96 | 9.37 | 0.00 | 9.37 | 1.00 |