Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2380.58 ft | 2372.58 | 2378.58 | 2379.58 | 2324.70ft | 383.067 | 26.25% | 2371.00ft | 948.359 | 54.44 | 11.07 | 0.00 | 11.07 | 39.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 162.50 | 161.00 | 161.50 | 162.00 | 141.24 | 333.194 | 32.74% | 155.98 | 655.525 | 63.38 | 6.92 | 0.00 | 6.92 | 56.80 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 953.90 | 135.200 | 30.28% | 969.64 | 275.430 | 34.91 | 19.28 | 0.00 | 19.28 | 22.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 763.70 | 73.350 | 36.49% | 772.15 | 159.350 | 115.74 | 0.00 | 0.00 | 0.00 | 128.80 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2627.20ft | 69.020 | 46.29% | 2649.10 | 113.220 | 14.99 | 2.80 | 0.00 | 2.80 | 48.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1586.10 | 23.540 | 42.98% | 1591.30 | 33.940 | 1.16 | 0.00 | 0.00 | 0.00 | 17.60 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1195.90 | 11.5958 | 23.27% | 1198.58 | 18.390 | 1.00 | 0.00 | 0.00 | 0.00 | 3.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 694.30 | 20.8439 | 43.97% | 706.50 | 43.9004 | 15.10 | 18.97 | 0.00 | 18.97 | 14.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 749.29 | 14.370 | 42.29% | 756.82 | 30.94 | 68.98 | 12.96 | 0.00 | 12.96 | 170.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.35 | 1.69 | 5.43% | 972.25 | 8.60 | 26.31 | 0.00 | 0.00 | 0.00 | 11.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 416.35 | 11.80 | 38.94% | 420.50 | 21.000 | 41.73 | 28.85 | 0.00 | 28.85 | 61.80 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1752.40 | 3.700 | 48.37% | 1755.15 | 5.075 | 0.58 | 0.00 | 0.00 | 0.00 | 5.60 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 451.35 | 3.377 | 52.52% | 456.10 | 6.156 | 25.73 | 31.93 | 0.00 | 31.93 | 49.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 0.9365 | 17.70% | 747.20 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 247.60 | 2.386 | 52.44% | 250.60 | 3.536 | 45.77 | 55.78 | 0.00 | 55.78 | 42.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.15 | 0.289 | 24.91% | 190.45 | 0.864 | 12.61 | 17.48 | 0.00 | 17.48 | 18.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.20 | 0.1917 | 25.12% | 820.50 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.60 | 0.140 | 35.90% | 847.00 | 0.140 | 8.84 | 9.12 | 0.00 | 9.12 | 4.20 |