Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2380.58 ft | 2372.58 | 2378.58 | 2379.58 | 2332.12ft | 462.311 | 31.68% | 2371.90ft | 961.152 | 56.69 | 15.74 | 0.00 | 15.74 | 0.60 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 162.50 | 161.00 | 161.50 | 162.00 | 145.48 | 417.080 | 40.98% | 156.67 | 672.080 | 46.52 | 0.00 | 0.00 | 0.00 | 0.00 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.36 | 973.36 | 974.36 | 974.86 | 958.07 | 166.460 | 37.28% | 970.21 | 282.270 | 29.86 | 6.71 | 0.00 | 6.71 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 773.50 | 772.00 | 772.50 | 773.00 | 767.50 | 108.750 | 54.10% | 772.05 | 158.350 | 23.15 | 0.00 | 0.00 | 0.00 | 0.00 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2633.60ft | 80.564 | 54.04% | 2653.50 | 123.816 | 20.06 | 2.99 | 0.00 | 2.99 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1587.55 | 26.440 | 48.27% | 1592.55 | 36.440 | 2.31 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.46 | 12.5670 | 25.22% | 1200.89 | 25.746 | 1.41 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 700.00 | 30.1779 | 63.67% | 706.85 | 45.0087 | 11.19 | 2.06 | 0.00 | 2.06 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.31 | 22.410 | 65.95% | 753.25 | 22.29 | 17.21 | 15.09 | 0.00 | 15.09 | 24.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.25 | 1.61 | 5.17% | 970.95 | 7.13 | 19.10 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 421.25 | 22.88 | 75.51% | 421.60 | 23.750 | 32.39 | 55.53 | 0.00 | 55.53 | 0.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1753.55 | 4.275 | 55.88% | 1757.75 | 6.725 | 0.58 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.20 | 3.810 | 59.25% | 455.90 | 6.030 | 27.16 | 25.68 | 0.00 | 25.68 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.00 | 1.0141 | 19.16% | 747.70 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 249.30 | 3.020 | 66.37% | 253.00 | 4.550 | 50.09 | 46.93 | 0.00 | 46.93 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.10 | 0.283 | 24.40% | 189.40 | 0.727 | 15.02 | 8.16 | 0.00 | 8.16 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.40 | 0.1993 | 26.12% | 820.80 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.85 | 0.200 | 51.28% | 846.20 | 0.050 | 9.03 | 8.90 | 0.00 | 8.90 | 0.00 |