Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2383.53 ft | 2375.53 | 2381.53 | 2382.53 | 2332.42ft | 465.522 | 31.90% | 2372.32ft | 967.113 | 65.59 | 26.96 | 0.00 | 26.96 | 2.00 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.00 | 161.50 | 162.00 | 162.50 | 145.60 | 419.600 | 41.23% | 156.87 | 676.880 | 44.39 | 14.87 | 0.00 | 14.87 | 9.40 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.75 | 973.75 | 974.75 | 975.25 | 958.20 | 167.500 | 37.51% | 970.32 | 283.590 | 25.08 | 13.04 | 0.00 | 13.04 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.00 | 772.50 | 773.00 | 773.50 | 767.60 | 109.750 | 54.60% | 772.00 | 157.450 | 11.57 | 0.00 | 0.00 | 0.00 | 15.60 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2633.80ft | 80.930 | 54.28% | 2653.60 | 124.062 | 6.87 | 2.63 | 0.00 | 2.63 | 10.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1587.65 | 26.640 | 48.64% | 1593.15 | 37.815 | 2.31 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.48 | 12.6017 | 25.29% | 1201.17 | 26.638 | 0.40 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 700.15 | 30.4761 | 64.30% | 706.85 | 45.0087 | 11.50 | 8.05 | 0.00 | 8.05 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 753.16 | 22.110 | 65.07% | 752.43 | 20.65 | 14.93 | 18.47 | 0.00 | 18.47 | 41.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 965.00 | 1.41 | 4.53% | 971.00 | 7.18 | 15.58 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.30 | 20.50 | 67.66% | 420.75 | 21.630 | 26.21 | 53.70 | 0.00 | 53.70 | 16.20 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1753.65 | 4.325 | 56.54% | 1758.05 | 6.935 | 0.58 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.00 | 3.709 | 57.68% | 455.95 | 6.061 | 24.19 | 25.37 | 0.00 | 25.37 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 747.10 | 0.9752 | 18.43% | 748.50 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.10 | 2.549 | 56.02% | 253.00 | 4.550 | 46.77 | 52.19 | 0.00 | 52.19 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 185.00 | 0.271 | 23.36% | 189.65 | 0.755 | 13.25 | 12.02 | 0.00 | 12.02 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.30 | 0.1955 | 25.62% | 820.80 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.50 | 0.118 | 30.26% | 845.50 | Shutdown | 8.34 | 9.29 | 0.00 | 9.29 | 0.00 |