Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2383.53 ft | 2375.53 | 2381.53 | 2382.53 | 2333.08ft | 472.584 | 32.38% | 2380.32ft | 1081.477 | 48.17 | 26.92 | 0.00 | 26.92 | 8.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.00 | 161.50 | 162.00 | 162.50 | 145.94 | 426.740 | 41.93% | 160.33 | 769.240 | 38.46 | 28.39 | 0.00 | 28.39 | 6.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.75 | 973.75 | 974.75 | 975.25 | 958.49 | 169.820 | 38.03% | 973.92 | 329.460 | 14.02 | 14.02 | 0.00 | 14.02 | 3.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.00 | 772.50 | 773.00 | 773.50 | 768.05 | 113.950 | 56.69% | 772.15 | 159.350 | 9.26 | 0.00 | 0.00 | 0.00 | 3.60 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2635.90ft | 84.900 | 56.95% | 2660.10 | 140.903 | 19.90 | 10.98 | 0.00 | 10.98 | 5.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1587.95 | 27.240 | 49.74% | 1595.60 | 43.940 | 2.31 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.61 | 12.8272 | 25.74% | 1202.65 | 31.351 | 0.60 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 699.70 | 29.6284 | 62.51% | 706.85 | 45.0087 | 1.75 | 8.11 | 0.00 | 8.11 | 2.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 752.16 | 20.100 | 59.15% | 753.16 | 22.11 | 8.65 | 17.82 | 0.00 | 17.82 | 30.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.45 | 0.97 | 3.11% | 980.75 | 20.75 | 8.92 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 419.40 | 18.25 | 60.23% | 420.50 | 21.000 | 30.00 | 17.18 | 0.00 | 17.18 | 5.40 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1753.95 | 4.475 | 58.50% | 1758.25 | 7.080 | 0.58 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.60 | 4.015 | 62.44% | 456.20 | 6.219 | 28.43 | 26.95 | 0.00 | 26.95 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 750.80 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 250.70 | 3.577 | 78.62% | 253.00 | 4.550 | 50.41 | 46.18 | 0.00 | 46.18 | 2.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.80 | 0.446 | 38.45% | 189.90 | 0.784 | 15.62 | 11.38 | 0.00 | 11.38 | 2.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.30 | 0.1955 | 25.62% | 822.50 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.55 | 0.130 | 33.33% | 846.20 | 0.047 | 9.93 | 10.48 | 0.00 | 10.48 | 0.00 |