Sl. No. | Name of Dam / Reservoir | District | MWL (metre) | FRL (metre) | Spillway Crest Level (metre) | Live Storage at FRL (MCM) | Rule level (metre) | Blue level (metre) | Orange level (metre) | Red Level (metre) | Today’s Water level (metre) | Today’s Live Storage (MCM) | % Storage wrt Live Storage at FRL | Same day previous year Water level (metre) | Same day previous year Live Storage (MCM) | Inflow (cumecs) | Power House Discharge(cumecs) | Spillway release (cumecs) | Total Outflow (cumecs) | Rain fall (mm) | Remarks |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20=18+19 | 21 | 22 |
1 | IDUKKI | IDK | 2408.5 ft | 2403 ft | 2373 ft | 1459.49 | 2383.53 ft | 2375.53 | 2381.53 | 2382.53 | 2333.14ft | 473.224 | 32.42% | 2382.50ft | 1117.559 | 34.43 | 25.57 | 0.00 | 25.57 | 0.40 | |
2 | IDAMALAYAR | EKM | 171.00 | 169.00 | 161.00 | 1017.80 | 163.00 | 161.50 | 162.00 | 162.50 | 145.96 | 427.160 | 41.97% | 161.31 | 796.773 | 24.06 | 18.64 | 0.00 | 18.64 | 1.20 | |
3 | KAKKI (ANATHODE ) | PTTA | 982.160 | 981.460 | 975.360 | 446.51 | 975.75 | 973.75 | 974.75 | 975.25 | 958.48 | 169.740 | 38.01% | 974.75 | 340.430 | 18.98 | 19.90 | 0.00 | 19.90 | 0.00 | |
4 | BANASURASAGAR (K A SCHEME) | WND | 775.600 | 775.600 | 767.000 | 201.00 | 774.00 | 772.50 | 773.00 | 773.50 | 768.20 | 115.750 | 57.59% | 773.10 | 170.750 | 20.83 | 0.00 | 0.00 | 0.00 | 15.60 | Tunnel Outflow – 0.0 MCM |
5 | SHOLAYAR | TSR | 2663 ft | 2663 ft | 2642 ft | 149.09 | 2658.00 | 2659.50 | 2661.00 | 2635.70ft | 84.515 | 56.69% | 2659.50 | 139.263 | 10.76 | 15.21 | 0.00 | 15.21 | 0.00 | ||
6 | MADUPETTY | IDK | 1599.59 | 1599.59 | 1594.71 | 54.77 | 1596.00 | 1597.00 | 1598.00 | 1588.00 | 27.340 | 49.92% | 1596.50 | 46.190 | 1.16 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0.00 McM | |
7 | ANAYIRANKAL | IDK | 1210.070 | 1207.020 | 1207.020 | 49.83 | 1205.02 | 1206.02 | 1207.02 | 1196.64 | 12.8792 | 25.85% | 1203.05 | 32.625 | 0.60 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | |
8 | PONMUDI | IDK | 708.660 | 707.750 | 701.350 | 47.40 | 704.50 | 705.50 | 706.50 | 699.45 | 29.2293 | 61.67% | 706.70 | 44.522 | 10.54 | 15.16 | 0.00 | 15.16 | 0.00 | ||
9 | KUTTIYADI (KAKKAYAM) | KKD | 758.040 | 758.040 | 751.640 | 33.98 | 755.50 | 756.50 | 757.50 | 751.88 | 19.550 | 57.53% | 755.26 | 27.05 | 11.32 | 17.67 | 0.00 | 17.67 | 36.00 | ||
10 | PAMBA | PTTA | 986.330 | 986.330 | 981.460 | 31.15 | 982.00 | 983.50 | 984.50 | 964.35 | 0.89 | 2.86% | 982.90 | 24.54 | 7.85 | 0.00 | 0.00 | 0.00 | 0.00 | ||
11 | PORINGALKUTHU | TSR | 423.980 | 423.980 | 419.410 | 30.30 | 421.00 | 422.00 | 423.00 | 420.20 | 20.25 | 66.83% | 419.70 | 19.000 | 26.71 | 3.56 | 0.00 | 3.56 | 3.00 | ||
12 | KUNDALA | IDK | 1759.30 | 1758.690 | 7.65 | 1755.00 | 1756.00 | 1757.00 | 1754.00 | 4.500 | 58.82% | 1758.15 | 7.005 | 0.29 | 0.00 | 0.00 | 0.00 | 0.00 | Sluice discharge/day – 0 McM | ||
13 | KALLARKUTTY | IDK | 456.900 | 456.590 | 450.200 | 6.43 | 455.00 | 452.15 | 3.785 | 58.86% | 455.90 | 6.029 | 21.04 | 23.70 | 0.00 | 23.70 | 0.00 | ||||
14 | ERATTAYAR | IDK | 754.380 | 754.380 | 748.280 | 5.29 | 748.28 | 746.90 | 0.8977 | 16.96% | 749.80 | 0.00 | |||||||||
15 | LOWER PERIYAR | IDK | 256.00 | 253.00 | 237.74 | 4.55 | 252.00 | 248.90 | 2.861 | 62.88% | 253.00 | 4.550 | 24.12 | 32.40 | 0.00 | 32.40 | 0.00 | ||||
16 | MOOZHIYAR | PTTA | 192.940 | 192.630 | 186.530 | 1.16 | 190.00 | 186.10 | 0.375 | 32.33% | 190.65 | 0.892 | 12.86 | 16.75 | 0.00 | 16.75 | 0.00 | ||||
17 | KALLAR | IDK | 824.480 | 824.480 | 818.380 | 0.76 | 823.50 | 820.30 | 0.1955 | 25.62% | 821.40 | 0.00 | |||||||||
18 | SENGULAM (PUMPING STORAGE DAM) | IDK | 849.49 | 847.640 | 847.64 | 0.39 | 846.75 | 0.177 | 45.38% | 846.20 | 0.047 | 10.18 | 9.63 | 0.00 | 9.63 | 0.00 |